Laserfiche WebLink
(Continued from page 4) <br />(IGA Continued from page 1) <br />scopes are designs <br />challenged from its inception. <br />that have taken their <br />The various aspects of the IGA are as follows: <br />cues from nature. <br />These informal designs <br />• NO NEW PERMANENT water taken out of the Arkansas Basin <br />are reflections of cas- <br />during the life of the IGA (at least 40 years). <br />ual living, allowing gar- <br />• Maximum of 54,000 a.f. a year can be transferred through Otero <br />deners to include flow- <br />Pump Station. <br />eying plants in and <br />• Maximum of 145,200 a.f. of interruptible supply water over 40 <br />years life of the IGA (3,630 a.f. per year average); with addi- <br />around their surround- <br />tional stipulations in regard to conservation measurements, water <br />ings in ways that go <br />pricing, at a less than 60 percent of reservoir storage capacity. <br />beyond a traditional <br />• During the first 25 years of the IGA, Aurora will not use inter - <br />perennial border. <br />ruptible supply contracts for more than three years in each 10- <br />When native plants are <br />year period. <br />. During the last 15 years, Aurora may elect to make up any short- <br />used, gardeners renew <br />fall of 145,200 a.f. limit using the following options: <br />and develop the unique <br />o 5 of 10 year interruptible supply, or <br />character of their re- <br />o 7 of 15 year interruptible supply (not to exceed 10,000 a.f. <br />gion and community. As <br />per year) <br />these distinctive land- <br />• The District will establish a SOFTENING POOL to alleviate the <br />crapes evolve they <br />1874 Rocky Ford call above the Rocky Ford headgate. <br />■ . The District will have a MOU with the Upper Arkansas Water <br />create a diverse envi- <br />Conservancy District. <br />ronment that encour- <br />■ • The District will establish a Regional Resource Development <br />ages soil, water and <br />Group to identify regional opportunities and establish priorities <br />wildlife habitat con- <br />■ to guide implementation of those recommended plans. <br />servntion. <br />• The District will benefit over $50 plus million. <br />A Xeriscape philoso- <br />In connection with the IGA is the ongoing effort to pass legislation <br />phy blends perfectly <br />to approve a feasibility study for the Preferred Storage Options Plan <br />with the conservation <br />(PSOP). With the signing of the IGA, Aurora has agreed to back leg- <br />leg- <br />ethic that is fast be- <br />islation for the enlargement of the Project. The Project enlargement <br />was part of our original forefathers requirements to adhere to future <br />coming part of our <br />water needs. Many communities suffered regrettable consequences <br />everyday lives. And in <br />from the drought and have realized future water planning is essen- <br />arid Colorado, the f o- <br />tial. The PSOP was formed so that communities can plan for future <br />cus of conservation is, <br />water needs. <br />The Fry -Ark Project has given us a legacy that demonstrates what <br />of course, on water. <br />cooperation can achieve. This IGA has also upheld that legacy. <br />Written by James Broderick, General Manager, SECWCD <br />Written by Jean Van Pelt, <br />Maintenance and Education Congratulations to Jean Van Pelt the District's maintenance & <br />Program Coordinator education program coordinator for the Xeriscape Garden. Jean <br />has been appointed to the board for the Colorado Water Wise <br />Council. Recently, Jean was selected as secretary for the board. <br />Jean will represent the southeastern area of Colorado. <br />0 <br />