Laserfiche WebLink
History and Statistics on Existing Projects <br />Florida Project <br />Location: Florida River (tributary to Animas River) <br />Completed: 1964 <br />Features: Lemon Dam and Reservoir <br />Florida Farmers Diversion Dam <br />Florida Farmers Ditch <br />Florida Canal <br />Consultation History: No Section 7 consultation <br />Purposes: Irrigation <br />* 19,450 acres of supplemental service to <br />Indian and non - Indian lands <br />* annual depletion of 18,100 acre -feet <br />Recreation <br />* reservoir -based facilities, managed by <br />U.S.F.S. <br />Flood Control <br />* reduce snowmelt flooding <br />Power <br />* non - Federal powerplant installed 1989 <br />under lease of power privilege with <br />Reclamation <br />Municipal and Industrial <br />* conversion of 114 a of non - project <br />water owned by the United States from <br />irrigation to M &I use <br />Note: This action is in the planning <br />phase. <br />Water Rights: Project water rights owned by the Florida <br />Water Conservancy District. Article 8.a. of the District <br />repayment contract provides that "the District shall have the <br />permanent right to use and dispose of project water subject to <br />the right of the United States to exercise control thereover for <br />flood control, recreation, and fish and wildlife purposes <br />consistent with the authorized project plan." <br />