My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda: Management Committe Meeting August 18-19 1994
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Agenda: Management Committe Meeting August 18-19 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2013 1:22:22 PM
Creation date
8/7/2012 3:46:59 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Agenda: Management Committe Meeting August 18-19 1994
State
CO
Date
8/18/1994
Title
Agenda: Management Committe Meeting August 18-19 1994
Water Supply Pro - Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
its cost can be squeezed to $10K. Agreed to set the cap at $420K, and to fund ASP -G and -H <br />Sauawfish Below Kenney Reservoir. ywW ; w111 nave u wyaowsxi wom v-11 ry <br />about determining the location of the squawfish and the need to relocate the existing closure in <br />FY95. Not expected to be expensive, but important. <br />Yana River Proposals (CRWCD). Ray Tenney reviewed his 7/27 revision of the Yampa <br />River Operation and Management Plan and the agricultural diversion revisions, and answered <br />questions. <br />Flooded Bottomlands. Need to assemble a technical advisory group, and have them <br />assemble better plan by 12/1/94. Don't want to hold up screening efforts underway. <br />This gets us within budget. <br />LONG -TERM RIP FUNDING. <br />NUMBERS CRUNCH - <br />CONCLUSION. <br />+10K <br />FWS Administrative Overhead Assessment <br />+50K <br />Floodplain Strategy <br />DEFERRED TO FY96, better SOW needed <br />+50K <br />Junior Biologist <br />DEFERRED. <br />+37K <br />Budget Analyst <br />DEFERRED. <br />+40K <br />White River <br />-20K <br />I &E Displays <br />-52K <br />Little Snake <br />-138K <br />Gila <br />-33K <br />Hydro Support (FY88 Approp) <br />-49K <br />Flaming Gorge <br />-10K <br />Aspinall <br />-35K <br />ASP -H &G <br />-39K <br />Bioenergetics <br />-18K <br />Non - Native Procedures <br />( -8K Colo, -10K RIP) <br />-25k <br />Sucker Key <br />-28k <br />Electrofishing <br />-40k <br />HC- blackrocks <br />-10K <br />Mosquito Abatement <br />-50K <br />Colo Water Acquisition <br />-28K <br />RIP Overhead <br />This gets us within budget. <br />LONG -TERM RIP FUNDING. <br />
The URL can be used to link to this page
Your browser does not support the video tag.