Laserfiche WebLink
its cost can be squeezed to $10K. Agreed to set the cap at $420K, and to fund ASP -G and -H <br />Sauawfish Below Kenney Reservoir. ywW ; w111 nave u wyaowsxi wom v-11 ry <br />about determining the location of the squawfish and the need to relocate the existing closure in <br />FY95. Not expected to be expensive, but important. <br />Yana River Proposals (CRWCD). Ray Tenney reviewed his 7/27 revision of the Yampa <br />River Operation and Management Plan and the agricultural diversion revisions, and answered <br />questions. <br />Flooded Bottomlands. Need to assemble a technical advisory group, and have them <br />assemble better plan by 12/1/94. Don't want to hold up screening efforts underway. <br />This gets us within budget. <br />LONG -TERM RIP FUNDING. <br />NUMBERS CRUNCH - <br />CONCLUSION. <br />+10K <br />FWS Administrative Overhead Assessment <br />+50K <br />Floodplain Strategy <br />DEFERRED TO FY96, better SOW needed <br />+50K <br />Junior Biologist <br />DEFERRED. <br />+37K <br />Budget Analyst <br />DEFERRED. <br />+40K <br />White River <br />-20K <br />I &E Displays <br />-52K <br />Little Snake <br />-138K <br />Gila <br />-33K <br />Hydro Support (FY88 Approp) <br />-49K <br />Flaming Gorge <br />-10K <br />Aspinall <br />-35K <br />ASP -H &G <br />-39K <br />Bioenergetics <br />-18K <br />Non - Native Procedures <br />( -8K Colo, -10K RIP) <br />-25k <br />Sucker Key <br />-28k <br />Electrofishing <br />-40k <br />HC- blackrocks <br />-10K <br />Mosquito Abatement <br />-50K <br />Colo Water Acquisition <br />-28K <br />RIP Overhead <br />This gets us within budget. <br />LONG -TERM RIP FUNDING. <br />