My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement No. 2-AB-30-00110
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Agreement No. 2-AB-30-00110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2013 1:32:01 PM
Creation date
8/2/2012 3:22:50 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Agreement No. 2-AB-30-00110 among the bureau of reclamation and the Colorado River Commission of Nevada, the Utah diversion of water resources, the central Arizona water conservation district, the upper Colorado River commission and the six agency committee, to provide funds to develop a program plan for a precipitation management demonstration activity
State
CO
NV
UT
AZ
Basin
Colorado Mainstem
Date
2/24/1992
Title
Agreement No. 2-AB-30-00110
Water Supply Pro - Doc Type
Contract/Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEN, BY :USER LOWER COLO REGION ' -21 -92 ; 9 :41 ; AUMINISTRAIi' `)rG du15s19'1u5;;;14 <br />4) . Every reasonable attempt will be made to obtain <br />consensus among all representatives on issues that come <br />before the Steering Committee. However, in the avant <br />that consensus is not achieved, the Project Manager <br />shall consider the positions of each of the <br />representatives in deciding an appropriate course of <br />action. <br />5). Any decision may be made by the Steering Co=ittee <br />in an assembled meeting or, upon consent of all <br />Steering Committee members, after the representatives <br />have had an opportunity to consult with one another, by <br />telephone /faxogram, telegraph, telex, letter, or by any <br />combination thereof. <br />b. The Steering Committee shall have the following duties <br />and responsibilities, as well as other duties which it may from <br />time to time agree to undertake, as long as such duties are <br />consistent with the terms of this MoU: <br />1) . Monitor the progress of development and completion <br />of the Program Plan. <br />2). Provide liaison among the Basin States, and the <br />Project Manager with respect to development of Program <br />Plan. <br />3). Review, discuses, and attempt to resolve any <br />disputes among the Basin States arising under the <br />Agreement and this MoU. <br />4). Provide direction to the Project Manager with <br />respect to the development of the Program Plan. <br />5). Review, and provide direction to the Project <br />Manager, regarding changes to the schedule, and scope <br />of work. <br />6) . Review and comment on drafts of documents <br />developed for the Program Plan. The Project Manager <br />shall consider incorporating, as directed by the <br />Steering Committee, all comments in preparing the final <br />documents. Drafts of documents shall be released to <br />the public only as directed by the Steering Committee <br />or as required by law. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.