My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150334 Loan Application
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150334 Loan Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2015 12:52:27 PM
Creation date
8/2/2012 2:32:57 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-044
C150334
Contractor Name
McDonald Ditch Company
Contract Type
Loan
Water District
20
County
Rio Grande
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Messick Letter March 18, 2011 2 <br />one payment schedule applies to Historically Underserved applicant(s), the second payment <br />schedule applies to all "other," applicants. <br />Project partners are responsible for all deliverables as written and scheduled in your proposal, <br />which are as follows: <br />Table 1, Conservation Practices That Will Be Used to Address Resource Concerns in the <br />2011 Rio Granda Plaza Project • Phase 2 <br />Conservation Practice <br />NRCS Project Application <br />Code <br />Estimated <br />,Rin;iripri. fpnrinq will bo isroFd to farAilare, prPqrr,&6 tjrA.zing <br />Riparian Fencing <br />382 land control the movement of grazing animal; in the Pro;ect <br />18.6 acres <br />pdred. The design wFN include rrivosoret; to ensure the fence 1� <br />Wildlife friendly, <br />Stream Habitat Improytrinent <br />I !Stream Habitat Improvement vill be used to improve physical, <br />395 therrical and biological furicticris of a stream and its associated <br />5 acres <br />aono tvanagernerit <br />........ . . <br />riparian zone through the establishment of woody vegetation, <br />�FiOi passages will be corsi.ruced to provide upstream and <br />Fish Passage <br />' downs0rn ea passage of fish and other aquatic organi5rns. <br />396 <br />2 fish r)assag( <br />'Passage structures will consider aquatic Swimming LdpaVilltieS <br />land will be compatible with existing and proposed structures, <br />- --------- - <br />.... . . . . ....................... <br />A pipeline may be tostalled to convey Prater foam an upstceawi <br />Irrigation Pipeline <br />4 3U diversion to the current downstream ditch. the pipeline will <br />Muo feet <br />-reduce the need to place an additional diversion in the river <br />Obstruction removal will occur on places where existing <br />Obstruction Removal <br />500 obstructions interfere with river flow or proposed site <br />775 cy <br />treatments. <br />Prescribed qi-azing will be users on sites that are grazed to <br />irriprove the health and vigor of the riparian plant commuMies, <br />PleWibed GidV119 <br />528 improve water quality and quantity, reduce accelerated soil <br />950 acres <br />eros;or, and improve the quarttly and quality of food and cover <br />for wddlife. <br />Stroambank. Protection will be used to stabilize bankg to <br />Strearnbank and Shoreline <br />prevent erosion, reduce sedurrierlL effects, maintain flow <br />580 <br />1725 cy <br />PruteLticin <br />t0pdLitY Ufthe UldnIfel, and fropruve the stream turridur fut <br />Oripr (',hknnpl will hp ijqpff to cnn0njrr Prnjprt rifp,; in <br />Open Channel 582 accordance with engineering plans. It Will include bank -,hoping 7110 cry <br />itU Te�ULe bedimerit erosion dW tlepusjUcin, <br />!Up to two (2) diversion structures will be replaced to control <br />Structure ror Mite; Cuotlol 587 the diveisiori, diAt ibutiun, erne delivery ofkvater to entitled 2 tttuftuleb <br />4d',ef shareholders, <br />
The URL can be used to link to this page
Your browser does not support the video tag.