Laserfiche WebLink
DIVERSION CAPABILITY <br />AND <br />RELATIVE PRIORITY STATUS <br />FOR THE 'CAMEO CALL# <br />0 Indicate relative priority <br />GRAND VALLE`(- <br />PROJECT DIVERSION <br />DAM <br />ENS <br />®i2o <br />052p`G�1G� � <br />Ak' PUMP 'j <br />V� PLANT J 1 <br />0272 cf s <br />�P <br />ORCHARD MESA <br />IRRIGATION CANALS <br />0171 cfs <br />QP <br />v� <br />v0 <br />PLATEAU CREEK <br />� SIPHON <br />P� VP <br />/r;Plc�l <br />0 <br />ORCHARD MESA <br />POWER PLANT <br />310 cf s J <br />VINELANDS DIVERSION <br />017 cfs <br />J Includes approxima tely <br />80 cfs for Palisade <br />Irrigation District and <br />40 cfs for Mesa County <br />Irrigation District, <br />J If radial gates are open, <br />flow returns to river. <br />If closed, flow goes into <br />the bypass channel and <br />into the Grand Valley <br />Canal, <br />