Laserfiche WebLink
51 <br />I <br />statements in the <br />Compact clarify <br />and specify <br />that no upstream <br />2 <br />I installation will <br />interfere with <br />or affect the <br />operation and <br />311 use of John Martin Reservoir. <br />4 So on that basis, •i would urge this Commission <br />5 to keep pushing both the Bureau and the Corps to bring this job <br />6 about. So if you -- <br />7 MR. COOLEY: We, of course, will receive your <br />8 <br />paper, but I <br />take <br />it that <br />in the <br />paper there was some <br />specific <br />9 <br />reference to <br />the <br />problem <br />of the <br />5,000 -foot measure at <br />Avondale. <br />10 MR. POLLART: Yes, yes. <br />11 Rather than to read this for you, I'd just as <br />12 soon give it to you and it's recorded and it was turned to them. <br />13 This is a copy of what the presentation was, and if you see fit <br />14 to use any figures that's in here, we're sure that they're <br />15 right. <br />16 MR, COOLEY: Do you have more than one copy? <br />17 MR. POLLART: I have, yes, two copies. <br />18 MR. COOLEY: Well, if you will give one to Lane as <br />19 one to myself, Lane will distribute copies to each of the <br />20 members of the Compact Administration and I will directly go <br />21 over yours and see if anything from here can be brought up with <br />22 the Corps. I will pursue the thing further and I don't think <br />23 we need any more discussion of it. <br />24 11 Kent, do you have ®- <br />25 MR. REYHER: other than maybe I think we do need <br />