Laserfiche WebLink
flood, as determined. in para`;ra­h 11.1. This would be a-g )roximatelY 3.5 <br />tim;;s greater than the maxiraam previous flood, and would reach an ostima.tod <br />gage hoi ght more than twice as great as the maximum of past record. As <br />past floods have occurred in tho late afternoon or evoning dulinL:; the <br />tourist season without nmch warning, it may be assumod that similar con- <br />ditions mould prevail at the time of the design flood. Under these <br />assumptions a. large loss of life may be expected in conjunction l;rith the <br />other flood losses. If this flood. occurred at night or on a wook -ond, <br />it is not improbable that over a. hundred lives might be lost, from among <br />people camping overnight in the canyon. A brief summar7r of the estimated <br />damages that would result from the flood is given in the following, para- <br />graphs. <br />70. Kittredge.- The estimated damages in the tovin of Kittredge would <br />amount to $40,000, divided as follows: Buildings and J.rr?rovements, $$30,000; <br />bridges, $5,000; and dar1LI.L�e to land from erosion or silt, $5,000. <br />71. Idledale.- The to *,.rn of Idledale would suf "e.r an estimated damage <br />of $25,000, of which amount $15,000 would be to buildi , s and improvements, <br />$5,000 to land, and $5,000 to bridges. <br />72. Bear Creek Canyon. - Along year Creek. Canyon, exclusive of the <br />toi,rns mentioned above, the do,, ;e would probably amount to $90,000. Summer <br />homes. along; the canyon would be damaUed to the extent of $50,000, while the <br />grounds would suffer $5,000 damage and the highway and bridges would probab- <br />17r suffer $25,000 damage . <br />73. Morrison.- Total damage in the town of Korrison would amount <br />to about $270,000. The principal item would 'be the buildings and im- <br />provements .!ith an estimated dama;_e of $200,000. The other damages would <br />be divided as follows: Utilities, $25,000; fish hatcher -,r, $25,000; land, <br />$10,000; and bridges, $10,000. <br />74, Below Morrison.- In this area it is estimated that the total <br />da.:ia,ge would be $25,000, allocated. as follows: Farmlands, $15,000; <br />roads aAd bridges, $5,000; ct;:,_d iisce_il 'Zeous, ,;':5,01.0. <br />— 22 — <br />