My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Report on Review of 308 Report Platte River, Colo., Wyo., and Nebr., House Document No. 197 73D Congress 2nd Session on Flood Control for Bear Creek Colorado
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Report on Review of 308 Report Platte River, Colo., Wyo., and Nebr., House Document No. 197 73D Congress 2nd Session on Flood Control for Bear Creek Colorado
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 1:40:40 PM
Creation date
7/26/2012 2:46:02 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Report on Review of 308 Report Platte River, Colo., Wyo., and Nebr., House Document No. 197 73D Congress 2nd Session on Flood Control for Bear Creek Colorado
State
CO
Basin
South Platte
Water Division
1
Date
3/1/1941
Author
Besson, F. S.
Title
Report on Review of 308 Report Platte River, Colo., Wyo., and Nebr., House Document No. 197 73D Congress 2nd Session on Flood Control for Bear Creek Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V <br />S <br />i s <br />i <br />i <br />01AR DEPARTI-ViENT <br />Office of the Division Engineer <br />MISSOURI RIVER DIVISION <br />1201 Davidson Building, <br />Kansas City, Mo. <br />April 17, 1941 <br />Subjects Notice of partially u. 'avorable <br />report on review of the report <br />on the Platte River, House Docu, <br />ment No. 197, 73d Congress, 2d <br />Session, on Flood Control, for <br />Bear Creek, Colorado. <br />Dear Sir: <br />It ba.ving come to the notice of the undersigned that you have ex- <br />pressed an interest in the pending proposition for flood control on the <br />Bear Creek,.Colorado, you are hereby informed that the report thereon, <br />authorized by Resolution of the Committee on Flood Control of the House <br />of Representatives; adopted June 16, 1918, has been made and is partially <br />unfavorable to improvement. <br />The report considers a project of channel improvement at Morrison, <br />Colorado, ev- acuation of the flood plain at Idledale, Colorado, a system <br />of reservoirs on the small tributaries, and a system of alarms to warn <br />tourists of impending flood danger in the valley. The report is unfavor- <br />able to .participation by the United States in any improvement for flood <br />control in the Bear Creek Basin at this time except at Morrison, Colorado. <br />The principal grounds upon which the adverse conclusions are based are <br />that (a) although a flood control project for Idledale, by means of evacu- <br />ation,.is justified by a consideration of intangible benefits and the <br />prevention -ef loss of life, local interests have not demonstrated their <br />.ability to furnish the necessary cooperation; (b) the damages in the <br />'Bear Creek-Basin are not sufficient to justify construction of retard- <br />ing reservoirs; and (c) the installation of a system of alarms is con- <br />sidered to be a proper police function of local authorities. <br />You are further notified that all interested parties have the <br />privilege "of an appeal from this conclusion to the Board of Engineers for <br />Rivers and Harbors, a permanent body sitting at ,7ashington, D.C., to which <br />all reports of this character are referred. Parties desiring to do so <br />may be heard on appeal by the Board, either orally or in writing. 11"ritten <br />communications should be addressed to the Board of Engineers for Rivers <br />and Harbors_, No, 2 New York Avenue, N.d , Washington, DEC., and should <br />be mailed in time to be in possession of the said Board within 4 weeks <br />from the date of this communication'. If, however, you have important <br />data to communicate to the Board which cannot be collected and put in <br />shape for proper presentation within 4 weeks, the Board should be informed <br />of this fact without delay ,and request made for an extension of the <br />limiting date for submitting information. If oral hearings are - desired, <br />dates for the same may be arranged by correspondence arc1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.