My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Technical Work Group Meetings 2009
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Technical Work Group Meetings 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2012 2:04:07 PM
Creation date
7/26/2012 1:33:07 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Technical Work Group Meetings 2009
State
CO
Date
9/29/2009
Title
Technical Work Group Meetings 2009
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' Glen Canyon Dam Technical Work Group Page 21 <br />DRAFT Minutes of March 16 -17, 2009, Meeting <br />ii <br />ii <br />Budget Discussion (cont.) <br />10. Diamond Creek NASQAN Station. Shane asked the TWG how they wanted to deal with this issue since <br />hearing Dr. Hart's presentation. Jay said in his dealings with other organizations, they've addressed USGS' <br />cutbacks and the need for the USGS to focus on its primary responsibility of basic data collection which <br />seems to be the first thing they ignore. He feels some recommendation needs to come out of AMWG to the <br />Secretary of the Interior to focus on needs of basic data collection. Dennis asked John what he thought the <br />cost would be for picking up the trips. Shane said it would be about seven trips per year at approximately <br />$47K for the year. <br />Status -> Remove from the list. The TWG needs to talk more about the data being collected before it can <br />send anything to the AMWG. Shane will bring up the TWG's concerns to the AMWG. <br />John passed out copies of the "Final Report of the Protocol Evaluation Panel for the GCMRC Integrated <br />Water Quality Program" (Attachment 11). <br />16. Cultural Program (cont.) Shane said they had two more items to discuss. He said rather than <br />implementing the money for the check dam program, the preservation treatments, and new tribal 106 <br />support, he would make the AMWG aware of the issues and the TWG would do more work this summer to <br />figure out and explain why they can't fund with the current funding and that they need more money. <br />Status 4 Shane will report to the AMWG. <br />17. General Core Monitoring. Shane suggested dropping #7 and accepting #17 because it's better written. <br />Status 4 TWG Chair has the discretion to drop #7 and /or combine 7and 17. <br />Norm asked how he thought the best way would be present the TWG's concerns to the AMWG. Shane said <br />he drafted the following statement: "TWG recommends that the issues of concern be resolved and either <br />incorporated into the budget or documented in writing why such is not appropriate. TWG requests either <br />AMWG concurrence with the TWG recommendations on the issues of concern or further direction. High <br />priority or controversial issues have specific recommendations included." <br />TWG Meeting Schedule. Shane said he would like to have a meeting toward the end of June and again in <br />October. He said there are a lot of things to do which may also require some conference calls. John Hamill <br />and Dennis Kubly said they both wouldn't be available on June 29 -30 as Shane had proposed, so it was <br />decided to hold the meeting on June 22 -23. <br />AIF: River Stage and Archaeological Sites (Attachment 12a). Mary passed out several documents: <br />Attachment 12b: An Evaluation of Selected Erosion Factors on Grand Canyon Archaeological Sites <br />Attachment 12c): Hoda's Sondossi's "Potential of Glen Canyon Releases to Inundate Cultural Sites in <br />Grand Canyon National Park: A GIS Analysis Using Modeled Virtual Shorelines, and Canyon -Wide <br />Topographic Data" PPT <br />Attachment 12d: CRAHG recommendations for 2010 -11 <br />Attachment 12e: The Cultural Resources Ad Hoc Group's Report to the Technical Work Group Regarding <br />the Hydrologic Engineering Centers River Analysis System (HEC -RAS) Model's Applicability to <br />Archaeological Sites <br />Attachment 12f. Geoarchaeological investigations and an archaeological treatment plan for 151 sites in <br />Grand Canyon, Arizona. Treatment plan implementation, including checkdam installation and maintenance <br />at the recommended sites. <br />Attachment 12g: Expanding the Tribal Monitoring Role for the Glen Canyon Dam Adaptive Management <br />Program <br />Mary reminded the TWG that at the last AMWG meeting there was a motion for the TWG to review the flow <br />levels as indicated by the currently available shorelines of the HEC -RAS model associated with each of the <br />158 archaeological sites that were identified for monitoring and /or mitigation of impacts and to report the <br />information and any recommendations with regard to how the data would fit into the process of making <br />
The URL can be used to link to this page
Your browser does not support the video tag.