My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150336 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150336 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2015 9:24:48 AM
Creation date
7/25/2012 7:53:36 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-088
C150336
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, types of water uses to be served and service area. (Attach separate sheet, if <br />needed.): <br />Allen Lake — Flatten slope and add riprap and bedding <br />Lake Isabelle — Relocate the outlet gate, Repair outlet Pipe, Seal the shaft. <br />6. Will the acquisition of additional water rights be necessary? <br />YES NO X If "YES ", please explain: <br />7. <br />M <br />10. <br />Please list the names and addresses of any technical or legal consultants retained to represent <br />the applicant or to conduct investigations for the proposed project: <br />NAME ADDRESS and PHONE <br />SMITH GEOTECHNICAL 1225 Red Cedar Circle, Suite H <br />(Duane H. Smith, P.E.) Fort Collins, CO 80524 <br />2 970 - 490 -2620; Fax: 970 - 490 -2851; dsmith @ smithgeotech.com <br />List any feasibility studies or other investigations which have been completed or are now in <br />progress for the proposed project. (Please submit one copy of each completed study with this <br />application): <br />Allen Lake and Lake Isabelle, March 2012 <br />What is the estimated cost of the project? Please include estimated Engineering costs, and <br />estimated Construction costs, if known: <br />Estimated Construction Costs: <br />Contingency @ 20 %: <br />Estimated Engineering Costs: <br />Permitting Costs: <br />Feasibility Study Costs: <br />Estimated Total Costs: <br />What loan amount and terms are you requesting ?: <br />Requested Loan Amount: <br />Term (length) of loan: <br />Interest Rate: <br />—3— <br />$ 876,000 <br />$ 176,000 <br />$ 176,000 <br />$ 35,000 <br />$ 10,000 <br />$ 1,273,000 <br />$ 1,145,700 <br />30 years <br />2.45% <br />
The URL can be used to link to this page
Your browser does not support the video tag.