My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150336 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150336 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2015 9:24:48 AM
Creation date
7/25/2012 7:53:36 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-088
C150336
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 8 <br />LAKE ISABELLE REHABILITATION <br />TOTAL PROJECT COST SUMMARY <br />THE SELECTED PROJECT <br />The Left Hand Ditch Company Board has chosen Construction Alternative 1 for the Allen Lake <br />Rehabilitation which is the rehabilitation of the dam with the using riprap for the slope protection. <br />This alternative was chosen based on the cost and because its ease of construction which can be <br />accomplished by many different contractors in the area. <br />The Left Hand Ditch Company Board has chosen Construction Alternative 2 for the Lake <br />Isabelle Rehabilitation which is to abandon the existing control system and relocate of the control <br />gate downstream near the end of the tunnel. This alternative was chosen based on the future <br />reliability and ease of access to the gate and operator which increases the safety to the ditch rider <br />who has to operate the gate. Repairs in the future would also be expected to be simpler due to the <br />change in access. <br />FINANCIAL PLAN <br />The estimated cost of the two projects is $1,273,000. The Company plans to apply for a 90% <br />loan in the amount of $ 1,145,700 loan from the Colorado Water Conservation Board small <br />projects fund. The remainder of the project will be paid for with funds raised by assessments and <br />also with cash the company has available in an existing certificate -of- deposit and money market <br />account. <br />Based on a $ 1,145,700 loan at an interest rate of 2.45% and a 30 year term, the annual payments <br />will be $54,376 per year. The interest rate of 2.45% was provided by the CWCB and is a blended <br />rate based on the percentage of the Company owned by agricultural, municipal high income, and <br />municipal middle income users and the interest rates for the CWCB fiscal year of 2012/2013. It is <br />anticipated the work will be conducted on Allen Lake Dam first, presumably in 2012, with the <br />Allen Lake and Lake Isabelle — 12.012 <br />Left Hand Ditch Company Page 21 <br />ITEM <br />ALTERNATIVE 1 <br />ALTERNATIVE 2 <br />1. <br />Construction Cost <br />$ <br />389,000 <br />$ <br />465,000 <br />2. <br />Contingency @ 20% <br />$ <br />78,000 <br />$ <br />93,000 <br />3. <br />Engineering Fees <br />$ <br />78,000 <br />$ <br />93,000 <br />4. <br />Feasibility Study <br />$ <br />5,000 <br />$ <br />5,000 <br />5. <br />Permitting <br />$ <br />35,000 <br />$ <br />35,000 <br />6. <br />Total Project Cost <br />$ <br />585,000 <br />$ <br />691,000 <br />r7. <br />Cost Per Acre Foot <br />$ <br />1,064 <br />$ <br />1,257 <br />THE SELECTED PROJECT <br />The Left Hand Ditch Company Board has chosen Construction Alternative 1 for the Allen Lake <br />Rehabilitation which is the rehabilitation of the dam with the using riprap for the slope protection. <br />This alternative was chosen based on the cost and because its ease of construction which can be <br />accomplished by many different contractors in the area. <br />The Left Hand Ditch Company Board has chosen Construction Alternative 2 for the Lake <br />Isabelle Rehabilitation which is to abandon the existing control system and relocate of the control <br />gate downstream near the end of the tunnel. This alternative was chosen based on the future <br />reliability and ease of access to the gate and operator which increases the safety to the ditch rider <br />who has to operate the gate. Repairs in the future would also be expected to be simpler due to the <br />change in access. <br />FINANCIAL PLAN <br />The estimated cost of the two projects is $1,273,000. The Company plans to apply for a 90% <br />loan in the amount of $ 1,145,700 loan from the Colorado Water Conservation Board small <br />projects fund. The remainder of the project will be paid for with funds raised by assessments and <br />also with cash the company has available in an existing certificate -of- deposit and money market <br />account. <br />Based on a $ 1,145,700 loan at an interest rate of 2.45% and a 30 year term, the annual payments <br />will be $54,376 per year. The interest rate of 2.45% was provided by the CWCB and is a blended <br />rate based on the percentage of the Company owned by agricultural, municipal high income, and <br />municipal middle income users and the interest rates for the CWCB fiscal year of 2012/2013. It is <br />anticipated the work will be conducted on Allen Lake Dam first, presumably in 2012, with the <br />Allen Lake and Lake Isabelle — 12.012 <br />Left Hand Ditch Company Page 21 <br />