My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150336 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150336 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2015 9:24:48 AM
Creation date
7/25/2012 7:53:36 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-088
C150336
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COST ESTIMATE <br />The complete breakdown of the work proposed and the cost of the work proposed for Alternative 1 <br />and Alternative 2, respectively, for both Allen Lake and Lake Isabelle are shown in TABLES 3, 4, <br />5, and 6. The costs are based on our past experience with similar projects and information and <br />costs provided by local contractors and suppliers. Left Hand Excavating has reviewed the costs <br />associated with this project and has provided significant input on the construction methods and <br />planning. Quantities were based on existing maps and drawings on file with the State Engineer. <br />For Allen Lake, a topographic survey was conducted and used to determine the details and <br />quantities of the work proposed. No detailed surveying has been conducted at Lake Isabelle with <br />the work being based on rudimentary measurements of the existing components with a tape <br />measure and plumb bob. <br />A summary of the costs for the two alternatives for each reservoir, including the engineering fees <br />and contingencies, are shown in the following TABLES 7 and 8. <br />TABLE 7 <br />ALLEN LAKE REHABILITATION <br />TOTAL PROJECT COST SUMMARY <br />Allen Lake and Lake Isabelle — 12.012 <br />Left Hand Ditch Company Page 20 <br />ITEM <br />ALTERNATIVE 1 <br />ALTERNATIVE 2 <br />1. <br />Construction Cost <br />$ <br />411,000 <br />$ <br />817,000 <br />2. <br />Contingency @ 20% <br />$ <br />83,000 <br />$ <br />164,000 <br />3. <br />Engineering Fees <br />$ <br />83,000 <br />$ <br />164,000 <br />4. <br />Feasibility Study <br />$ <br />5,000 <br />$ <br />5,000 <br />5. <br />Total Project Cost <br />$ <br />582,000 <br />$ <br />1,150,000 <br />6. <br />Cost Per Acre Foot <br />$ <br />827 <br />$ <br />1,634 <br />Allen Lake and Lake Isabelle — 12.012 <br />Left Hand Ditch Company Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.