My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150335 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150335 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 8:39:30 AM
Creation date
7/25/2012 7:40:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150335
Contractor Name
Center of Colorado Water Conservancy District
Contract Type
Loan
County
Park
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Well No. 2 (unregistered), which lies <br />1575 feet South and 620 feet West of the <br />Northeast corner of Section 13, Twp. 9 <br />South, Range 78 West of the 6th P.M. <br />London Mining & Smelting Ditch, a /k /a <br />Smelter Pipelines, (State Engineer $6762); <br />the point of diversion of said pipeline <br />is located on the left bank of Mosquito <br />Creek, from whence it derives its supply <br />of water, at a point whence the E 1/4 <br />corner of Section 13, Twp, 9 South, Range <br />78 West of the 6th P.M. bears South 58° <br />30' East 1892 feet. <br />Smelter Pipeline Reservoir is located as <br />follows: Commencing at the South Quarter <br />corner of Section 13, Twp. 9 South, Range <br />78 West of the 6th P.M., thence North 430 <br />23135" East 856.80 feet to cap on valve <br />screen, thence South 52 042125° East 147 <br />feet to true point of beginning; thence <br />North 62 004'50" West 365 feet; thence <br />South 85 015'30" West 93.37 feet; thence <br />South 8 011' East 69.23 feet, thence South <br />10 009' West 136.64 feet; thence <br />South 13 018' East 163.29 feet; thence South <br />21 018' East 131.87 feet; thence South 280 <br />40' East 107.12 feet; thence North 67° East <br />71.24 feet; thence North 86050'East 232.13 <br />feet; thence North 21 °25' East 147.99 feet; <br />thence North 74 037140" East 132.46 feet; <br />thence North 16 040120" West 83.23 feet; thence <br />North 62 036140" West 102.04 feet; thence <br />North 10 018120" West 73.57 feet; thence North <br />87 030140" West 58.64 to the true point of <br />beginning. <br />4. The source of water of Wells 1 and 2 is the allu- <br />v*um of Mosquito Creek. <br />The source of water of London Mining and Smelter <br />Ditch is Mosquito Creek. <br />The source of water of Smelter Pipeline Reservoir <br />is the London Mining and Smelter Ditch. <br />5. The date of appropriation: <br />well $1 <br />Well #2 <br />London Mining & <br />Smelter Ditch <br />Smelter Pipeline <br />Reservoir <br />6. The amount of water: <br />Well $1 <br />Well 12 <br />London Mining & <br />Smelter Ditch <br />Smelter Pipeline <br />Reservoir <br />-2- <br />August 1, 1913 <br />November 25, 1935 <br />December 17, 1909 <br />December 17, 1909 <br />15 gpm. or .03 cfs. <br />15 gpm. or .03 cfs. <br />1450 gpm. or 3.1 cfs. <br />18.08 acre feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.