My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150335 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150335 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 8:39:30 AM
Creation date
7/25/2012 7:40:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150335
Contractor Name
Center of Colorado Water Conservancy District
Contract Type
Loan
County
Park
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9.2. Legal Description of Structure. The center of the dam is located in the SW 1/4 <br />NE 1/4, Section 13, Township 9 South, Range 78 West of the 6`h p.m. <br />9.3. Source. The source of water for the London Mining and Smelter Reservoir Is' <br />Enlargement is Mosquito Creek, tributary to the Middle Fork of the South Platte River. <br />9.4. Name and Capacity of Ditch Used to Fill the Reservoir. CCWCD shall fill and <br />refill the London Mining and Smelter Reservoir Is` Enlargement with surface water diversions <br />from Mosquito Creek under the conditional water right granted for the London Mining and <br />Smelter Ditch Enlargement in Paragraph 7 above. <br />9.5. Appropriation Date. The appropriation date for the London Mining and Smelter <br />Reservoir ls` Enlargement is September 2, 2009, based on the adoption of a resolution of <br />CCWCD's Board of Directors at its September 2, 2009 meeting that directed the filing of this <br />application and by other overt acts demonstrating intent to appropriate this conditional water <br />right. <br />9.6. Decreed Storage Amount. <br />a. In acre feet. 50 acre feet, conditional, with right to fill and refill. <br />b. Rate of diversion for filling the Reservoir. 1.5 c.f.s., conditional. <br />9.7. Decreed Uses. Storage for augmentation, substitution and exchange, domestic, <br />commercial, industrial, irrigation, livestock, recreation, fish and wildlife propagation and fire <br />protection. CCWCD shall use the stored water for beneficial purposes within Park County, <br />Colorado. <br />9.8. Decreed Surface Area at High Water Mark. <br />a. Conditional. 5.1 acres <br />9.9. Decreed Dam Specifications. <br />a. Maximum height of dam in feet. 9.9 feet <br />b. Length of dam in feet. 500 <br />9.10. Total capacity of reservoir in acre feet. <br />a. Active Capacity. 50 acre feet. <br />b. Dead Storage. 0 (zero). <br />10. As to the conditional water storage right decreed herein, CCWCD has completed all of <br />Center of Colorado Water Conservancy District <br />09CW 145 <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.