Laserfiche WebLink
Modeling Results for <br />Colorado River Basin States' Modeling of <br />Colorado River and Reservoir Management Strategies <br />conditions (i.e., a flood control surplus), Mexico receives up to 1.7 MAF per <br />year. <br />7) Yuma Desalting Plant bypass flows to the Cienega de Santa Clara in Mexico are <br />assumed to be 109,000 acre -feet per year (the historical average from 1990- <br />2003) and are not counted as part of the Mexican Treaty delivery. Replacement <br />of the bypassed water is not assumed to occur in the future. <br />8) Lake Mohave and Lake Havasu are operated in accordance with their existing <br />rule curves. <br />3 <br />