My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application of Town of Silverthorn RICD January 2005
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Application of Town of Silverthorn RICD January 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 4:24:28 PM
Creation date
7/13/2012 2:07:22 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Application of Town of Silverthorn RICD January 2005
State
CO
Date
1/21/2005
Title
Application of Town of Silverthorn RICD January 2005
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
controlled width that will create a pooling effect upstream and control, concentrate, and direct <br />the flow through the structures at a sufficient velocity and depth to produce a reasonable <br />recreational experience associated with the beneficial uses described below. <br />3. Legal Description of the Structures. The Course will be approximately 600 feet long, <br />located within the channel of the Blue River in the town limits of the Town of Silverthorne <br />between the Interstate -70 overpass and the Colorado Highway 9 bridge as depicted on the map <br />attached hereto as Exhibit A -2, in South '' /z of Section 12, Township 5 South, Range 78 West of <br />the 6th P.M., Summit County, Colorado. The approximate locations of the center points of the <br />three structures within the Course are as follows: <br />Structure 1 <br />located in the S/2 of Section 12, T5S, R78 W, <br />6th P.M.at a point 1050 feet from the south <br />section line and 2380 feet from the east section <br />line of said Section 12 <br />Structure 2 <br />located in the S/2 of Section 12, T5S, R78 W, <br />6th P.M.at a point 1250 feet from the south <br />section line and 2520 feet from the east section <br />line of said Section 12 <br />Structure 3 <br />located in the S/2 of Section 12, T5S, R78 W, <br />6th P.M.at a point 1470 feet from the south <br />section line and 2590 feet from the east section <br />line of said Section 12 <br />Although the precise location of the structures may, upon construction, be somewhat different <br />from the locations described above, the structures will generally be distributed evenly through <br />the stream reach described above. Provided that the locations of all the structures remain within <br />the stream reach described above, any variation in structure location from the locations described <br />herein will be simply described in the decree entered herein or, if such decree is entered before <br />construction of any or all of the structures, in subsequent applications for diligence or <br />applications to make absolute the water rights claimed herein <br />4. Source: Blue River, Salt Lick Gulch and Straight Creek, tributaries of the Blue River, a <br />tributary of the Colorado River. <br />5. A. Date of appropriation: December 31, 2004 <br />B. How appropriation was initiated: Formation of intent and filing of the application. <br />C. Date water applied to beneficial use: Not applicable <br />6. Amount claimed: <br />K <br />
The URL can be used to link to this page
Your browser does not support the video tag.