Laserfiche WebLink
Terrace Irrigation Company Agenda Item 16a <br />March 9, 2012 (Updated March 23, 2012) <br />Page 4 of 6 <br />The Company has applied for a Section 404 general permit from the Corps of Engineers and is <br />awaiting a response. It is anticipated that the permit will be granted and no additional permits will <br />be required. <br />Engineering design efforts for the spillway replacement were funded under Phase I of the ISF <br />Project. The funding for this Project will be dedicated to construction related expenses for the <br />demolition and replacement of the spillway. Table 1 provides a summary of estimated costs to <br />complete the spillway replacement Project. <br />TABLE 1: TOTAL PROTECT COST SUMMARY <br />Task <br />Cost <br />Engineering (Construction Management) <br />$350,000 <br />Construction <br />$3,750,000 <br />Contingency <br />$400,000 <br />Total <br />$4,500,000 <br />Financial Analysis <br />The Company qualifies for an interest rate of 1.75% based on the agricultural base rate of 2.75 %, <br />for a 30 -year term, with a 1% restricted reservoir rate reduction in accordance with CWCB <br />Financial Policy #7. In addition, the Company has requested $3,500,000 in grant funding between <br />the WSRA and NRD accounts. Table 2 provides a financial summary of the loan request. <br />TABLE 2: PROJECT FINANCIAL SUMMARY <br />Total Project Cost <br />$4,500,000 <br />WSRA Rio Grande Basin <br />$75,000 <br />WSRA Statewide <br />$1,425,000 <br />Natural Resources Damages Settlement <br />$2,000,000 <br />CWCB Loan Amount (construction of Spillway Replacement Project ) <br />$1,000,000 <br />Existing Debt Balance <br />$1,724,721 <br />Consolidated CWCB Loan Amount (existing plus new ) <br />$2,724,721 <br />Consolidated CWCB Loan Amount with 1% service fee <br />$2,751,968 <br />Consolidated CWCB Annual Loan Payment <br />$118,692 <br />Consolidated CWCB Loan Obligation (including 10% debt reserve funding) <br />$130,561 <br />Current Annual Payment for Existing CWCB Loans <br />$134,198 <br />Number of Shareholders <br />24 <br />Number of Shares <br />831.875 <br />Current Assessment (per share <br />$230 <br />Future Assessment (per share <br />$230 <br />Cost of Project per AF <br />$293 <br />The sequencing of CWCB fund disbursement will be as follows: NRD funds shall be fully <br />disbursed prior to disbursement of any loan or WSRA grant funds, or as otherwise required by the <br />NRD policies; subsequent disbursements will then be issued at a prorated ratio for loan and WSRA <br />grant funding, up to the approved limits. <br />