My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WC Sample Plan Contract
CWCB
>
Grants
>
DayForward
>
WC Sample Plan Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 4:20:37 PM
Creation date
6/14/2012 4:13:38 PM
Metadata
Fields
Template:
Grants
Applicant
Aquacraft Inc
Grant Type
Severance Tax
Fiscal Year (i.e. 2008)
2012
Project Name
Sample Municipal Water Efficiency Plan
CWCB Section
Water Conservation & Drought Planning
Contract/PO #
C154199
Related Templates
Water Conservation
Grants - Doc Type
Contract/Purchase Order
Document Relationships
Sample Water Efficiency Plan
(Message)
Path:
\Water Conservation\DayForward
WC Sample Plan Invoice2
(Message)
Path:
\Grants\DayForward
WC Sample Plan SOW
(Attachment)
Path:
\Grants\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Task 2: CWCB and Stakeholder Review Processes <br /> 2.1 Draft 1 <br /> CWCB staff will review the first draft Sample Municipal Water Efficiency plan and will provide <br /> comments back to Aquacraft. CWCB shall complete their review within two weeks of receiving <br /> the draft Sample Plan. Aquacraft will incorporate recommended changes into the draft Sample <br /> Plan and will prepare the second draft. <br /> 2.2 Draft 2 <br /> Next the second draft Sample Plan will be reviewed by the CWCB's Water Conservation <br /> Technical Advisory Group (WCTAG) using a process similar to the one used to review the <br /> Municipal Water Efficiency Plan Guidance Document. <br /> 2.3 WCTAG Review Process <br /> Aquacraft will conduct one meeting with the CWCB's Water Conservation Technical Advisory <br /> Group (WCTAG) to review the draft Sample Plan and all the components of it. This meeting will <br /> be one of the 2 meetings/presentations called for in the Project Administration and <br /> Deliverables section of this Scope of Work. The WCTAG will have the opportunity to review the <br /> draft Sample Plan and additional materials for approximately two weeks prior to the meeting. <br /> Following the meeting, the WCTAG will have an additional week to submit comments on the <br /> draft Sample Plan. Aquacraft will assemble (in a customized Excel spreadsheet matrix) and <br /> review all WCTAG comments and will incorporate as many comments and suggestions as <br /> possible into the final Sample Plan. <br /> 2.4 Draft 3 <br /> Aquacraft will prepare the draft 3 final Sample Municipal Water Efficiency Plan and will provide <br /> it to CWCB for approval. <br /> 2.5 Final Sample Plan <br /> It is anticipated that only minor modifications will be made based on the final CWCB review <br /> after which Aquacraft will prepare the final Sample Plan and provide it and all supporting <br /> documents and information to CWCB for public release. <br /> Task 2 — Key Inclusions <br /> Aquacraft will complete the following as part of Task 2: <br /> • Provide first draft of Sample Plan to CWCB for review <br /> • Prepare second draft Sample Plan and associated materials, incorporating a single set of <br /> CWCB comments. <br /> • Schedule WCTAG meetings for Sample Water Efficiency. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.