My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150331 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150331 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 1:11:00 PM
Creation date
3/29/2012 8:13:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150331
Contractor Name
North Delta Irrigation Company
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
chains; North 860 30' West 4 chains; North 86° 30' West 4 chains; <br />South 830 West 5.30 chains; North 770 30' West 6 chains; South 790 <br />Wes 21 chains; South 85 chains; North 47° West 5 chains; North 310 <br />30',East 11 chains; North 250' West 9 chains; North 860 West 20 <br />cha'Ins; South 410 45' West 26 chains; North 570 West 24.50 chains; <br />South 50 West 32 chains; South 630 45' West 14 chains; North 58 <br />0 <br />West 21 chains; South 8° 30' West 20 chains; North 470 West 2850 <br />chains; North 820 15' West 39 chains; North 430 30' West 29 chains; <br />South 530 30' West 35 chains; North 470 40' West 25 chains; South <br />23° 15' West 44 chains; West 32 chains; thence westerly to the <br />center of Section 3 in Township 15 South of Range 96 West of the <br />Six h Principal Meridian, thence southwesterly to the southwest <br />cor er of the said Section 3; thence southwesterly to the quarter <br />section corner between sections 8 and 9 of said Township and Range. <br />To ether with the extension of the North Delta Canal as now <br />constructed and in -operation. Also the inverted siphon line from <br />the tunnel on said line East of Tongue Creek to the line of the <br />North Delta Canal as said siphon is now constructed. Also to <br />acquire by purchase seventy -five feet of water per second of time <br />from the Gunnison River and its tributaries as heretofore decreed <br />to flow into the Gunnison River by decree of the District Court of <br />Delta County entered in the month of June, 1914, and as heretofore <br />ac uired by appropriation and beneficial use by means of said <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.