Laserfiche WebLink
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />Fax: (303)866-4474 <br />www.cwcb.state.co.us <br />TO: Colorado Water Conservation Board Members <br />FROM: Ryan Edwards, P.E., Project Manage>Alt(i <br />Kirk Russell, P.E., Chief 1612- <br />Finance Section <br />DATE: January 13, 2012 (Updated January 31, 2012) <br />John W. Hickenlooper <br />Governor <br />Mike King <br />DNR Executive Director <br />Jennifer L. Gimbel <br />CWCB Director <br />SUBJECT: Agenda Item 27a, January 23 -24, 2012 Board Meeting <br />Finance Section — Construction Fund — Change to Existing Loan <br />The Jackson Ditch Company — Check Dam Rehabilitation Project <br />Introduction <br />The Jackson Ditch Company (Company) received approval of a loan for its Check Dam <br />Rehabilitation Project (Project) in September 2011. The Project involves the installation of a new <br />check dam structure across the Cache la Poudre River, allowing the Company to divert its most <br />senior water rights during times of low flow. The Company is requesting a loan increase because <br />the three contractor bids exceeded the engineer's estimated project cost of $90,000. The revised <br />total project cost is estimated to be $137,000, which is a 52% increase over the original project cost. <br />The loan request is for 90% of the revised total project cost. <br />Staff Recommendation (Board approved staff recommendation on January 24, 2012) <br />Staff recommends the Board approve a loan increase of $42,723 ($42,300 for project costs and <br />$423 for the 1% Loan Service Fee), from the Construction Fund, to the Jackson Ditch Company. <br />The Company's amended total loan amount will be $124,533 ($123,300 for project costs and <br />$1,233 for the 1% Loan Service Fee) for engineering and construction costs related to the Check <br />Dam Rehabilitation Project. The loan terms shall remain 30 -years at a blended rate of 3.60% per <br />annum. Security for the loan shall be in compliance with CWCB Financial Policy #5. <br />Background and Current Project Status <br />At a point approximately five miles northwest of Fort Collins the Cache la Poudre River splits and <br />flows around an island located 700 feet upstream of the Jackson Ditch diversion gate. During <br />periods of low flow the Company must utilize the check dam structure to secure its most senior <br />water rights. The check dam spans the river from the upstream tip of the island to the west river <br />bank, and diverts flows around the east side of the island towards the Company's diversion gate. <br />Using the structure to reroute river flows enables the Company to divert water that would otherwise <br />Interstate & Federal • Watershed & Flood Protection • Stream & Lake Protection • Finance <br />Water Information • Water Conservation & Drought Planning • Water Supply Planning <br />