Laserfiche WebLink
Firestone Drought Management Plan <br /> 25% progress report <br /> December 19, 2011 <br /> We have conducted two stakeholder meetings which have provided input for Steps 1, 2, <br /> 3 and 4. We have assessed the historical drought impacts and tallied their interest in <br /> future supply-side and demand-side response strategies, as well as potential public <br /> information messaging. We have had preliminary discussions about what they would <br /> like to see in the development of the drought stages. We have also evaluated other <br /> entities drought stages, such as their water provider's, to consider for consistency of <br /> message. We didn't want our plan to be confusing with the other plans out there. <br /> Our next step is to outline the drought stages and triggers and get feedback at the next <br /> Stakeholder meeting. We will then present the draft drought stages to the Town Board <br /> for their feedback. Since we do not know what the response will be to our proposed <br /> drought stages, we are unsure of the remaining work for this step. We estimated we <br /> would be done with Step 5 (development of drought stages, trigger points and response <br /> targets) by mid-November. However, it is more likely this will occur mid-Jan, so we are <br /> about 2 months behind schedule. We would like to update the schedule once we have <br /> Step 5 complete, which will also coincide with the 50% progress report. Our budget <br /> seems to be tracking fairly well with the steps that we have completed. We are learning <br /> to balance presenting a lot of information while trying to streamline the process. Overall, <br /> this has been a lot of open discussion and brainstorming of ideas that has been very <br /> helpful to the Town. <br /> 8010 S.County Road 5,Ste.105 I Windsor,CO 80528 I (T)970.223.3706 I (F)970.223.3763 I www.clearwatercolorado.com <br />