My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12000000012 report
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
12000000012 report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2011 1:38:10 PM
Creation date
10/12/2011 1:33:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
12000000012
Contractor Name
Rio Grande Canal Water Users Association, The
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Permits Issued - Turbine Purchase and Interconnection <br />The order for the turbine will be placed following the issuance of permits and the power purchase <br />agreement. At the same time Xcel will be authorized to complete the power line extension required <br />to reach the site, and install the transformer. The turbine will be delivered within 6 months of the <br />order. <br />Construction <br />Construction on this site will best be performed either in the early spring or the fall. At these times <br />the river flows are low but temperatures are high enough to successfully place concrete and <br />perform construction activities. Construction will begin with preparing the bay for the installation <br />of the turbine, raising the existing concrete side walls and constructing a new wall behind the radial <br />gate. During construction, the radial gate will seal the area from water entering the work area and a <br />small cofferdam will be installed to dewater the downstream side of the turbine. The stilling basin <br />will also be constructed at this time by excavating and lining a small pool below the existing grade <br />at the exit of the turbine. When the turbine arrives on site, the civil infrastructure will be completed <br />and ready for the turbine to be installed. Turbine installation is expected to be completed within a <br />few days, including the interconnection to the grid. <br />Commissioning <br />Immediately following the installation of the turbine, the facility will be commissioned. Testing will <br />occur with the manufacturer as required by the utility. From this point forward the turbine will be <br />producing electricity for the Water Users. <br />IMPLEMENTATION SCHEDUI.F, <br />•FERC Exemption <br />•CWCB Loan Feasibility <br />•Power Purchase Agreement <br />•CWCB Loan <br />•NEPA Permitting <br />•Final Design <br />•Turbine order placed <br />•Interconnection Construction <br />•Construction of Civil Infrastructure <br />•Installation ofTurbine <br />•Commissioning of Facility <br />Rio Grande Canal Water Users Association � Project Description : <br />