My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150138 feas study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150138 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2011 8:51:35 AM
Creation date
10/5/2011 10:51:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150138
Contractor Name
Supply Irrigating Ditch Company
Contract Type
Loan
Water District
0
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />�J <br />lJ <br />, <br />� <br />I' <br />I� <br />I, <br />I' -. <br />I' <br />I' <br />CWCB Construction Fund Loan Application <br />The Ditch Company has the opportunity to trade water rights in Beaver Park Reservoir for Big T <br />Units that can be converted to cash that will offset the cost of rehabilitating Knoth Reservoir. <br />Knoth reservoir will provide 542 AF of storage and an"equalizer" faciliry to place free river water. <br />The stockholders of the Company will be the direct beneficiary of this storage facility, and those <br />stockholders, for the most part, are agricultural users. <br />Water Right: CFS. Average water diverted per year: <br />6. Will the acquisition of additional water rights be necessary? YES <br />If YES, please explain. <br />NO X <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br />NAME ADDRESS and PHONE <br />Duane Smith, P.E. 1225 Red Cedar Circle, Suite H, Fort Collins, Co. 8052 <br />970-490-2620 <br />Attorney — to be determined_ <br />acre-feet. <br />, 8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />' application. Mr. Smith has completed a feasibility study of the project and is now in the <br />process of revising the study. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br />Estimated Engineering Costs: $9,750 <br />Estimated Construction Costs: $to be determined <br />Estimated Total Costs: $ <br />10. Loan amount and terms you are requesting. <br />3 CFLA602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.