Laserfiche WebLink
� <br />�J <br />lJ <br />, <br />� <br />I' <br />I� <br />I, <br />I' -. <br />I' <br />I' <br />CWCB Construction Fund Loan Application <br />The Ditch Company has the opportunity to trade water rights in Beaver Park Reservoir for Big T <br />Units that can be converted to cash that will offset the cost of rehabilitating Knoth Reservoir. <br />Knoth reservoir will provide 542 AF of storage and an"equalizer" faciliry to place free river water. <br />The stockholders of the Company will be the direct beneficiary of this storage facility, and those <br />stockholders, for the most part, are agricultural users. <br />Water Right: CFS. Average water diverted per year: <br />6. Will the acquisition of additional water rights be necessary? YES <br />If YES, please explain. <br />NO X <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br />NAME ADDRESS and PHONE <br />Duane Smith, P.E. 1225 Red Cedar Circle, Suite H, Fort Collins, Co. 8052 <br />970-490-2620 <br />Attorney — to be determined_ <br />acre-feet. <br />, 8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />' application. Mr. Smith has completed a feasibility study of the project and is now in the <br />process of revising the study. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br />Estimated Engineering Costs: $9,750 <br />Estimated Construction Costs: $to be determined <br />Estimated Total Costs: $ <br />10. Loan amount and terms you are requesting. <br />3 CFLA602 <br />