Laserfiche WebLink
� � <br />Tabte 2 <br />Rio Grande Reservoir Enlargement <br />Raise 10 feet <br />Engineer's Opinion of Costs - Reconnaissance Levet <br />October 2006 <br />Construcfion lfem Quanfity Unit Cost �tension <br />1 Mobilization (@5%) 1 LS $917,000 $917,000 <br />Subtotal $917,000 <br />2 Dam Embankmeni <br />a. Foundation Preparation (upstream) <br />b. Foundation Preparation (downstream} <br />c. Remove Existing Rip & Rip Rap bedding <br />d. Construct Coffer Dam <br />e. Foundation Grouting <br />f. Dam Rockfilt (for Dam Raise) <br />g. Extend Existing Toe Drains <br />h. PVC bedding <br />i. PVC lining <br />j. Riprap bedding <br />k. Riprap <br />I. Crest Road (Paved) <br />3 Left Abutment <br />a. Clearing/Grubbing/Stripping <br />b. Left Abutrnent Drainage Gallery Tunnel <br />and Drains <br />c. PVC beddinglfrlter <br />d. PVC Liner <br />4 Outlet Works <br />a. Construct New Lower Outlet Tunnel <br />b. Construct New Upper Intake Tunnel <br />c. Existing Outlet Tunnel Extension <br />d. Construct New Valve Shaft <br />e. Air Vent for Existing Outlet Tunnef <br />f. Demo and Raise existing Outlet Building <br />and replace Outlet Building <br />g. New Fixed Cone Valves and Structure <br />h_ (nstall New gate <br />5 Spillway <br />a. Raise Spillway Training Walls <br />b. New Spillway Weir <br />c. Improve existing spiltway channel <br />d. Concrete Parapet Wall <br />6 Miscellaneous <br />a. Instrumentation <br />b. Seeding and Fertilizing <br />c. Care of the River <br />d. Tree Removal Reservoir Perimeter <br />10,OOd <br />10,000 <br />15,000 <br />1 <br />1 <br />115,000 <br />500 <br />5,000 <br />100,000 <br />5,000 <br />15,000 <br />670 <br />50,000 <br />250 <br />15,000 <br />75,000 <br />670 <br />375 <br />175 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />CY $10 $100,000 <br />CY $15 $150,OOQ <br />CY $4 $60,000 <br />LS $200,000 $200,000 <br />LS $400,000 $400,000 <br />CY $8 $920,000 <br />LF $100 $50,000 <br />CY $20 $100,000 <br />SF $4 $400,000 <br />CY $25 $125,000 <br />CY $40 �,000 <br />LF $100 $67,000 <br />Subtotal $3,172,000 <br />CY $10 $500,000 <br />LF $5,000 $1,250,000 <br />CY $20 $300,000 <br />SF $4 $300,000 <br />Subtofa/ $Z350,000 <br />LF $3,500 $2,345,000 <br />LF $3,500 $1,312,50U <br />LF $2,000 $350,000 <br />LS $2,000,000 $2,000,000 <br />LS $400,000 $400,000 <br />LS $1,000,000 $1,000,000 <br />LS $1,000,000 $1,000,000 <br />LS $500,000 $500,000 <br />Subtotal $8,907,500 <br />LS $400,000 $40d,000 <br />LS $800,000 $800,000 <br />LS $1,500,000 $1,500,000 <br />LS $100,000 $100,000 <br />Subtotal $2,800,000 <br />1 LS $300,000 $300,000 <br />10 Acre $8,000 $80,000 <br />1 LS $500,000 $504,000 <br />30 Acre $7,500 $225,000 <br />Subtota/ $1,105,000 <br />Total Construction Items �19,251,500 <br />Misc and Unlisted Items @ 5% $960,000 <br />Permitting @ 20% $3,850,000 <br />Engineering @ 15% 2 890 000 <br />Subtotal $26,951,500 <br />Contingency @ 30% $8,090,000 <br />s <br />�= -{ EST/MATED TOTAL (rounded to nearest �900,OOQ) a35,000,000 <br />, � . <br />�; <br />.e•- <br />P:\0246 CbM Engineers\0246.001.00 Rio Grande Resenroir Enlargement Study\EOC.xIs <br />10/31/2006 <br />