Laserfiche WebLink
• <br />Table 1 <br />� <br />Rio Grande Reservoir Rehabilitation <br />' Engineer's Opinion of Costs - Reconnaissance Level <br />October 2006 <br />Construction ltem Quanfity Unit Cost Extension <br />1 Mobilization (@5%) 1 LS $463,000 $463,000 <br />Subtota! $463,000 <br />Z Dam Embankment <br />a. Foundation Preparation (upstream} <br />b. Remove Existing Rip & Rip Rap bedding <br />c. Construct Coffer Dam <br />e. Foundation Grouting <br />d. PVC bedding <br />e. PVC lining <br />f. Riprap bedding <br />g. Riprap <br />3 Left Abutment <br />a. Clearing/Grubbing/Stripping <br />b. Left Abutment Drainage Gallery Tunnel <br />and Drains <br />c. PVC bedding/filter <br />d. PVC Liner <br />4 Outtet Works <br />a. Construct tVew Lower Bypass Outtet <br />Tunnel <br />b. Construct New Gate Shaft <br />c. Air Vent for E�tisting Outlet Tunnel <br />d. Expand ebsting Outfet Building <br />e. lnstall new Gate <br />5 Spillway <br />a. New Spillway Weir <br />b. Improve existing spillway channel <br />c. Concrete Parapet Wal( <br />6 Miscellaneous <br />a. lnstrumentation <br />b. Seeding and Fertilizing <br />c. Care of the River <br />10,000 <br />15,000 <br />1 <br />1 <br />5,OQ0 <br />100,000 <br />S,OOQ <br />15,000 <br />50,000 <br />250 <br />15,000 <br />75,000 <br />CY $10 $100,000 <br />CY $4 $60,000 <br />LS $200,000 $200,000 <br />�s $aoo,00a �oo,oao <br />CY $20 $100,000 <br />SF $4 $400,OOQ <br />CY $25 $125,000 <br />CY $40 $600,000 <br />Subtotat $t,985,D00 <br />CY $10 $500,000 <br />LF $5,000 $1,250,000 <br />CY $20 $300,000 <br />SF $4 $300,000 <br />Subtotal $2,350,000 <br />150 LF $3,500 $525,000 <br />1 LS $500,000 $500,000 <br />1 LS $400,000 $400,000 <br />1 LS $15Q,000 $150,000 <br />1 LS $500,OOQ $500.000 <br />Subtota! $2,075,000 <br />i LS $400,000 $400,000 <br />1 LS $1,500,000 $1,500,000 <br />7 LS $100,OOQ $1�0,000 <br />Subtota! $2,000,000 <br />1 LS $300,000 $300,000 <br />5 Acre , $8,000 $40,000 <br />1 LS $500,000 _ $500,000 <br />Subtotal $840,000 <br />Total Construction Items $9,713,000 <br />Misc and Unlisted Items Q 5% $490,000 <br />Permitting @ 5% $490,000 <br />Engineering @ 15% 1 460 000 <br />Subtofal $12,153,000 <br />Contingency @ 30% $3,650,000 • <br />ESTIMATED TOTAL (rounded to nearest 3900,000} �15,800,OOD <br />r <br />r_.� ,! .. <br />. �'. . � <br />�' <br />P:1024fi �DM Engineers\0246.001.00 Rio Grande Reservoir Entargement StudylEOC.xIs <br />10/31/2006 <br />