Laserfiche WebLink
I. The BoRROwER shall construct the PRO�ECT in accordance with the approved <br />plans and specifications. <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide <br />as-built drawings of the PRO�ECr to the CWCB staff, or, if required by § 37- <br />87-105, C.R.S., the BoRROwER shall provide the as-built drawings to the <br />State Engineer's Office for approval and filing. <br />K. Upon completion of the PRO�ECT construction, the BoRROwER shail arrange a <br />final inspection for the CWCB staff. <br />L. The BoRROwER shall pay all of the expenses related to the PRO�ECr when <br />such bills are due. <br />S�c�ioN 8— ELIGI�L� Ex��NS�s. The foflowing items are eligible for loan <br />disbursements. <br />A. Preparing final designs and specifications for the PRO�ECr. <br />B. Preparing bid and construction contract documents. <br />C. Preparing environmental assessment or environmental impact statements, <br />and otherwise complying with the Federal National Environmental Policy Act. <br />D. Complying with all federal, state, and local regulatory requirements, including <br />the obtaining of aA required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws <br />and regulations. <br />F. Actual construction as called for in the design documents and in change <br />orders approved by the CWCB and the BoRROwER. <br />G. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br />H. Interest during completion of the PRO�ECT pursuant to Paragraph A.4 of the <br />Contract. <br />I. Legal services for reviewing engineering services contracts, reviewing this <br />Contract, reviewing construction contract documents, and for complying with <br />all federal, state, and local regulatory requirements. <br />J. PRO�ECT-related expenses incurred p�ior to the Effective Date of this contract <br />in accordance with the legislative approval of this loan. <br />S�CiION 9 — DIS�URS€M�Nfi SCH�DUL� <br />For Project costs: The BoRROwER shall prepare a periodic progress report <br />which contains a statement of the PRO�ECT costs expended for that period <br />and shall forward said statement to the CWCB. After receipt of the periodic <br />progress report from the BORROWER, and review and acceptance of the items <br />therein as eligible expenses as described below, the CWCB will pay to the <br />Bo��ow€R the amount set forth in the report or such portion that has been <br />Appendix 1 to Loan Contract C150293 <br />Page 3 of 4 <br />