My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150293 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150293 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2011 10:57:35 AM
Creation date
8/16/2011 9:59:51 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150293
Contractor Name
North Sterling Irrigation District
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
casts, nat to exeeed 90% Of t11� CASt Of tI1� PR�JECT, witi� a loan originatian fee af <br />1% in accordance with CWCB Policy No. 16, at an interest rate of 2.25% per annum <br />for a repayment term of 20 years. <br />SECTION 5— SCHEDULE OF EXISTING DEBT <br />No existing debt. <br />SECfiI�N 6— ADB1fiI�NAL C�NDIfiI�NS & CONfiRACfi REQUiR�MENfiS <br />No additional conditions or contract requirements. <br />SECTION 7- CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BoRROwER shall empioy an engineer, registered in the state of Colorado <br />to prepare plans and specifications for the PRO�ECr. <br />B. Th@ BORROWER's and the Engineering Consultant's plans and specifications <br />must be submitted to the CWCB staff for verification of compliance with the <br />terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as <br />defined by § 37-87-105 C.R.S., the BoRROwER shall provide a letter of <br />approval from the State Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid openin� and must approve the award of <br />the construction contract. <br />E. The BORROWER shall contract for <br />responsible and capable Construction <br />shall be selected by the Bo��ow€� <br />staff. <br />the construction of the work with <br />Firms, which said Construction Firms <br />and found acceptable by the CWCB <br />F. The BoRROwER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid <br />and bid bond at bidding. After the CWCB staff verifies that these documents <br />comply with the terms of this contract, the BoRROwER may issue the notice to <br />proceed to the Construction Firms. <br />G. The BoRROwER shall conduct a pre-construction conference at which time <br />the CWCB staff shall have the opportunity to review and approve the <br />construction schedule. <br />H. If the CWCB staff determines that the PRO�ECT requires a resident inspector <br />during construction, the BORROwER shall employ an inspector who has been <br />approved by the CWCB staff. <br />Appendix 1 to Loan Contract C150293 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.