Laserfiche WebLink
translate it into SVP workshop #1 to David Merritt <br />the SVP model. review draft model Brian Bledsoe <br />and ecological and Boris <br />operational Kondratieff <br />components Kurt Fausch <br />Leroy Poff <br />Share the SVP SVP workshop # 1 Lee Rozaklis SVP Model May 30, 2009 <br />model with other John Sanderson <br />project David Merritt <br />participants Brian Bledsoe <br />through a series Boris <br />of two Kondratieff <br />workshops to Kurt Fausch <br />first Leroy Poff <br />collaboratively <br />agree upon the <br />model. <br />Develop SVP workshop # 2 Lee Rozaklis Flow and Operational May 30, 2009 <br />alternatives and John Sanderson recommendations <br />assess David Merritt based on alternatives <br />alternatives by Brian Bledsoe assessment and SVP <br />running series of Boris model runs <br />operational and Kondratieff <br />flow scenarios Kurt Fausch <br />through the Leroy Poff <br />model to analyze <br />and document <br />potential project <br />outcomes from <br />both <br />consumptive and <br />non-consumptive <br />needs. <br />Incorporate Post workshop #2 Lee Rozaklis Report summarizing June 30, 2009 <br />ecological and meeting with John Sanderson flow and operational <br />biological metric participants to David Merritt recommendations, <br />and targets into a review workshop # 1 Brian Bledsoe SVP model and <br />SVP model with and 2 results and Boris alternatives <br />water rights, make formulate Kondratieff assessment. <br />operational, and expert flow & model Kurt Fausch <br />hydrologic recommendations Leroy Poff <br />constraints. <br />Task 3: Oversee and manage the development of the SVM and facilitate the <br />SVP planning process. <br />The cornerstone of Task 3 is a series of three workshops that engage the HSWMP participants <br />and numerous stakeholders in the SVP process and in SVM development. <br />