My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Halligan Seaman_Contract & Scope of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
South Platte - Halligan Seaman_Contract & Scope of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2013 6:00:48 PM
Creation date
8/15/2011 3:22:12 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
South Platte
Applicant
City of Greeley
Description
Halligan Seaman Water Management Project: Shared Vision Planning Model
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
150436
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ecolo ical flows. <br />Manipulate that Final expert Bill Miller SVP Model CED + 7 <br />data and then meeting prior to Lee Rozakiis months <br />translate it into SVP workshop #1 to John Sanderson <br />the SVP model. review draft model David Merritt <br />and ecological and Brian Bledsoe <br />operational Boris <br />components Kondratieff <br />Kurt Fausch <br />Lero Poff <br />Share the SVP SVP workshop # 1 Lee Rozaklis SVP Model CED + 7 <br />model with other John Sanderson months <br />project David Merritt <br />participants Brian Bledsoe <br />through a series Boris <br />of two Kondratieff <br />workshops to Kurt Fausch <br />first Leroy Poff <br />collaboratively <br />agree upon the <br />model. <br />Develop SVP workshop # 2 Bill Miller Flow and Operational CED + 7 <br />alternatives and Lee Rozaklis recommendations months <br />assess John Sanderson based on alternatives <br />alternatives by David Merritt assessment and SVP <br />running series of Brian Bledsoe model runs <br />operational and Boris <br />flow scenarios Kondratieff <br />through the Kurt Fausch <br />model to analyze Leroy Poff <br />and document <br />potential project <br />outcomes from <br />both <br />consumptive and <br />non-consumptive <br />needs. <br />Incorporate Post workshop #2 Lee Rozaklis Report summarizing CED + 8 <br />ecological and meeting with John Sanderson flow and operational months <br />biological metric participants to David Merritt recommendations, <br />and targets into a review workshop # 1 Brian Bledsoe SVP model and <br />SVP model with and 2 results and Boris alternatives <br />water rights, formulate expert Kondratieff assessment. <br />operational, and flow & model Kurt Fausch <br />hydrologic recommendations Leroy Poff <br />constraints. <br />Task 3: Oversee and manage the development of the SVM and facilitate the <br />SVP planning process. <br />The cornerstone of Task 3 is a series of three workshops that engage the HSWMP participants <br />and numerous stakeholders in the SVP process and in SVM development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.