My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - Platoro Reservoir Restoration_Completion Letter
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - Platoro Reservoir Restoration_Completion Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2017 12:33:09 PM
Creation date
8/11/2011 1:54:28 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Rio Grande
Applicant
Conejos Water Conservancy District
Description
Platoro Reservoir Restoration
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
C150448
WSRA - Doc Type
Project Completion Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In order to install the new valves, the complete valve body was disassembled on site and lowered <br />into position, one half at a time. The valve halves were then aligned and sealed together. As soon <br />as the valve body was re-assembled the concrete footing was re-grouted and anchor bolts <br />attached to support the weight. Each of the 44 bolts around the circumference of the flange was <br />tightened to a torque of 1470 ft/lbs. The discharge nozzle was installed and the process was <br />repeated for the other valve. <br />�..� <br />� <br />� <br />� <br />�� <br />' , � <br />�f <br />� <br />�,. <br />� <br />.��. v�� <br />� y �; �; <br />A � y � <br />� � <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.