My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - Platoro Reservoir Restoration_ Contract
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - Platoro Reservoir Restoration_ Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2017 12:30:32 PM
Creation date
8/11/2011 1:51:48 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Rio Grande
Applicant
Conejos Water Conservancy District
Description
Platoro Reservoir Restoration
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
C150448
WSRF - Doc Type
Board Approval Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />� <br />Task Details Total <br />several operations and measure closure seal fit. Adjust seal and <br />stops as required. <br />Operate valves under actual flow conditions to verify ability to hold <br />valve-opening position, smooth and positive movement and rate of <br />open control, proper stops, and seal adjustment. Check motor <br />temperature of the valve operator motor after full load operation. <br />Verify electrical phase loads and voltages. Leave Valve House and <br />surrounding area clean and acceptable to the District. Remove all <br />construction equipment, left over supplies, debris, garbage, etc. <br />Repair any damage done to District's equipment, facilities, and <br />grounds. <br />Total � $296,200 <br />CWCB Approval <br />CWCB approved staff recommendation on September 17, 2008 for a grant not to exceed $50,000 from <br />the Rio Grande Basin Account and $200,000 from the Statewide Account to help complete the Platoro <br />Reservoir Restoration project. <br />District's Funding Participation <br />The District has completed nearly $411,725 in improvements in previous phases of this project. The <br />District will cover all costs of the valve replacement, which exceed WSRA grant funding limits. <br />Schedule <br />If WSRA funding is in place by May 1, 2009, the District anticipates ordering the new valves and taking <br />delivery around September 1, 2009. Installation will begin around October 15, 2009 and be completed <br />within 90 days. <br />Payment <br />Payment will be made based on actual expenditures and invoicing by the water activity sponsor. The <br />request for payment must include a description of the work accomplished by major task, and estimate of <br />the percent completion for individual tasks and the entire water activity in relation to the percentage of <br />budget spent, identification of any major issues and proposed or implemented corrective actions. The last <br />5 percent of the entire water activity budget will be withheld until iinal project/water activity <br />documentation is completed. <br />All products, data and information developed as a result of this grant must be provided to CWCB in hard <br />copy and electronic format as part of the project documentation. <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.