My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - Platoro Reservoir Restoration_Quarterly Progress Report
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - Platoro Reservoir Restoration_Quarterly Progress Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2017 12:32:57 PM
Creation date
8/11/2011 1:48:17 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Rio Grande
Applicant
Conejos Water Conservancy District
Description
Platoro Reservoir Restoration
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
C150448
WSRA - Doc Type
Progress/Interim Reports
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONEJOS WATER CONSERVANCY DISTRICT <br />PLATORO RESERVOIR RESTORATION PROJECT <br />QUARTERLY PROGRESS REPORT <br />2"a Quarter 2009 <br />3rd Quarter 2009 <br />4th Quarter 2009 <br />lst Quarter 2010 <br />2°a Quarter 2010 <br />3ra Quarter 2010 <br />� 4th Quarter 2010-FINAL REPORT <br />Contract Routing Number 09 PDA 00110 <br />Contract No. 150448 <br />Grant Amount: $250,000 <br />This quarterly report is being submitted by the Conejos Water Conservancy <br />District (the "District") to the Colorado Water Conservation Board (the "CWCB") <br />pursuant to Section 9 of the Grant Contract between the District and CWCB, signed by <br />the state on 4/16/2009. <br />The first phase of the Platoro Restoration Pro�ect was completed November 4, <br />2008, which included the by-pass piping and the painting of the 440-foot discharge tube. <br />The total cost of this phase was $417,696.96, which has all been paid to the contractors <br />from sources other than grant funds. <br />In the 2°d Quarter, 3rd Quarter and 4th Quarter of 2009, the District engaged in <br />negotiations and discussions with the U.S. Bureau of Reclamation regarding the <br />valves/gates to be installed on the Platoro Dam and details and specifications regarding <br />the valves. The District and the Bureau agreed that jet flow gates will be installed to <br />replace the existing valves and agreed on specifications. <br />In the 1 St Quarter of 2010, the District identified the contractor which will be <br />fabricating the jet flow gates which will replace the existing valves on the Platoro Dam <br />and replacing the valves: Prime Machine, Inc. The contractor is different than the <br />contractor whose original price quote was attached to the scope of work and formed the <br />basis for the original budget. A revised budget table is attached to this progress report. <br />The District understands that it will be responsible for any costs in excess of the grant. <br />The District negotiated an agreement with Prime Machine, Inc., which is expected to be <br />executed on or around May 3, 2010. <br />In the 2°a quarter, Prime Machine was instructed to proceed and has in fact <br />fabricated the valve housings and seal rings. Some pictures were included with the <br />invoice for $21,000, which has subsequently been paid. More pictures will be sent with <br />the next invoice to the state. <br />
The URL can be used to link to this page
Your browser does not support the video tag.