0 <br />4.0 WORK TASKS <br />The proposed Phase 2 Work Tasks are outlined in this section. Please note that the effort involved in <br />each of the following work tasks could vary substantially with the addition or deletion of 10825 <br />alternatives, or as more information regarding project elements is developed. The work tasks outlined <br />below are also presented in the project timeline (Figure 2). Please note that the proposed study process <br />is not sequential, and that most work tasks will be in progress concurrently. <br />4.1 Selection of 10825 Elements (Phase 1 Studv) <br />The potential elements and projects to be considered in the Phase 2 Study will be selected by the 10825 <br />stakeholders following the completion of the Phase 1 Screening Study. The number of elements <br />selected will have a major effect on the work involved to cornplete the Phase 2 study. <br />Based upon preliminary results of the Phase 1 study (which is well underway) we anticipate that the <br />following elements and projects may be evaluated in the Phase 2 Study. This preliminary list IS NOT <br />intended to predetermine the outcome of the Phase 1 study feedback anticipated from the Steering <br />Committee. Direction from the Steering Committee to Grand River will be required on this point in <br />May. <br />Structural Elements: Sulphur Gulch Reservoir <br />Roan Creek Reservoir (mainstem) <br />Mt. Logan Reservoir (Roan Creek Off-Channel) <br />Buzzard Creek Reservoir <br />Yank Creek Reservoir <br />Wolcott Reservoir <br />Wolford Raise and Pumpback <br />OMID Improvements <br />Ruedi to Basalt Gravity Discharge Line <br />15 Mile Reach Pumpback (Gunnison River to GVIC) <br />Non-Structural Elements: Ruedi Reservoir <br />Williams Fork Reservoir <br />Wolford Mountain Reservoir <br />Green Mountain Reservoir <br />Lake Granby / Colorado-Big Thompson west slope storage <br />Some alternatives may be developed that use a combination of structural and non-structural operating <br />scenarios (for example: OMID improvements and Green Mountain HUP). It is possible that additional <br />project elements may be recommended for consideration in the Phase 2 study, however, we believe that <br />the above list includes the primary existing (non-structural) and future (structural) elements from which <br />reasonable 10825 alternatives may be assembled. <br />10825 Phase 2 Scope of Work Revised May 25, 2007 per CWCB request Page $ <br />