My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150016 feas study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150016 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:28:29 AM
Creation date
8/4/2011 3:06:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150016
Contractor Name
Idaho Springs, City of
Contract Type
Loan
Water District
7
County
Clear Creek
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. The expected yield of the project will be a safe storage capacity of 227 AF, an <br />increase of 107 AF from the existing restriction. <br />5. Cost estimates. The estimated costs are based on a conceptual level of detail, and <br />include the necessary contingencies and conservatism. <br />A. Planning costs: These costs will be financed by the City of Idaho <br />Springs, and include staff time and consultant costs for preparation <br />of this feasibility study. <br />B. Design costs: Design costs will be financed in part through the <br />requested CWCB loan. The design costs are estimated at 10% of the <br />construction cost. <br />C. Construction costs: The construction costs are estimated with detail <br />shown in Appendix 3. <br />D. Construction contingencies (estimated at 10% of construction costs). <br />E. Construction engineering (estimated at 5% of construction costs). <br />Total <br />$8,500 <br />$87,325 <br />$873,250 <br />$87,325 <br />$43,600 <br />$1,100,000 <br />6. No additional operating and maintenance (O&M) costs are anticipated by the City <br />of Idaho Springs. Actual O&M costs may be reduced with the rehabilitated dam structure. <br />E. <br />7. Implementation Schedule <br />a. Start Design <br />b. Complete Design <br />c. Bid the Job <br />d. Bid Opening <br />e. Start Construction <br />f. Complete Construction <br />g. Project is Operational <br />Impacts and Permitting <br />06/30/00 <br />12/15/00 <br />O1/15/Ol <br />03/OS/O1 <br />04/30/O 1 <br />09/28/O l <br />10/26/O l <br />1. Social, Economic, and Physical Impacts <br />a. The project will have no significant social impacts. <br />b. The project will have economic impacts, and will provide the City of <br />Idaho Springs with additional long-term revenue from water sales. <br />: <br />
The URL can be used to link to this page
Your browser does not support the video tag.