Laserfiche WebLink
Woodward�Cly <br />� <br />Mr. Garrett Jacksan, P.E., a Senior Staff Engineer with Woodward-Ciyde Consultants, <br />has over 12 years of construction experience and over 6 years of engineering experience <br />including design, layout, and construction of highways, pipelines, earth dams, landfills, <br />and storage tanks. He has performed site investigations, and engineering analyses, <br />constructian management and observation, and project management for dam and <br />structure faundations, earthwork construction, and underground storage tanks. <br />Mr. Pete Stauffer. Mr. Stauffer received his master's degree from the University o£ <br />Texas in geotechnical engineering in 1984, and has 12 years of experience with <br />landslides, slope stabilization, preparation of plans and specificatians, and construction <br />engineering. Mr. Stauffer was the ' t r for investigation of the Telluride <br />Airport landslide and the Forest Ci <br />We have also included the resu ad� may be used on subsequent <br />phases of the work including M . John Andrew and Scott Randall �or hydrolog,y, and <br />Mr. Al Meyer for cost estimating. <br />Other members of WCC's Denver office staff will be assigned to the project as necessary <br />ta meet technical and schedule requirements. <br />3.3 CLIENT REFERENCES <br />We would encourage you to contact any of the persons listed below for an evaluation <br />of ow qualifications, capabilities and past performance. � <br />Woodward-Clydo Conwltants <br />233601PR0.3 12-08-93(8:S3em)/RPT 3-1� <br />