Laserfiche WebLink
BLUE LAI�:E OWNERS' <br />ASSOCIATION <br />RA.W IF�RIGATIUN SYSTEM <br />ESTIMATED BUDGET FOR INSTALLATION OF R.AW WATER <br />IRRIGATION SUPPLY TO CONIMON AREAS AND EACH LOT <br />Excavation �for pump and water supply installation <br />Installation of ductile iron pipe <br />Pump house construction <br />460 volt electrical supply to pump house <br />20x street cuts and sleeve installation <br />Flagging and signage on street cuts <br />14x bike path cuts and sleeve installation <br />Main line pipe installation and taps to each lot <br />Landscape, irrigation and lot repairs <br />Job bond <br />Project overseeing <br />As built drawings <br />Estimated parts <br />Pumps and installation of <br />Add additional allowance for parts <br />Culvert installation <br />Job Total <br />10 hp -.70/hour for electricity, 12 hours/day x 6 months <br />75 hp - 5.25/hour for electricity, 6 hours/day x 6 months <br />1,533 over 6 months <br />5,749 over 6 months <br />7,282 is $1.73/lot annualized <br />60,000 <br />30,000 <br />. 7,500 <br />30,000 <br />75,000 <br />7,500 <br />15,000 <br />350,000, <br />55,000 <br />10,000 <br />25,000 <br />1,000 <br />152,428 <br />80,000 <br />23,243 <br />125,000 <br />. � <br />