My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150243 approval ltr
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150243 approval ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 11:57:12 AM
Creation date
7/26/2011 11:29:09 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150243
Contractor Name
Aurora, City of
Contract Type
Loan
Water District
0
County
Adams
Bill Number
SB 07-122
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� City of Aurora Agenda Item 9f <br />� January 23-24, 2007 (REVISED January 29, 2007) <br />Page 7 of 7 <br />Table 2. Financiai Ratios <br />Without Project w�th Project <br />Financial Ratio Est: 2006 Future Years <br />Pro ": 2011 <br />Operating Ratio (revenues/expenses) 310%(Strong)* 304%(Strong)* <br />weak: <100% - average: 100% - 120%� - stron :>120% $131 M/42M $185M/61 M <br />Debt Service Coverage Ratio 396%(Strong)** 157%(Strong)** <br />(revenues-expenses)/debt service <br />weak: <100% - avera e: 100% -120% - stron : >120% $89M/23M $124M/77M <br />Cash Reserves to Current Expenses 101 %(Strong) 25%(Weak) <br />weak: <50% - avera e: 50% -100% - stron : >100% $42M/42M $15M/61 M <br />Debt per Tap (based on 68,600 taps) $3,500/tap $14,o00/tap*** <br />eak: >$5000 - avera e: $5K - $2.5K - stron : <$2500 (Average) (V1/eak) <br />* Includes tap fees ** Does not include debt service reserve "'* Includes 1.7% growth in taps <br />Col/ateral: Security for the CWCB loan will be a pledge of Utility Enterprise revenues from the <br />City's Water Fund as described in the General Ordinance and applicable Series Ordinances which <br />governs its debt. The pledge shall be backed by a rate covenant (1.05x coverage) and annual <br />financial reporting. CWCB shall have a second lien on the pledged revenues that will be on a parity <br />with all existing and future second-lien Water Fund obligations. <br />Staff Recommendation (Board Approved the following Staff Recommendation on 1/23/2007) <br />Staff recommends the Board approve a loan not to exceed $75,750,000 ($75,000,000 for project <br />costs and $750,000 for the 1% Loan Service Fee) to the City of Aurora acting by and through its <br />Utility Enterprise for project costs (not to exceed 90% of the cost of the Conveyance System of the <br />Prairie Waters Project) from the Construction Fund. The terms of the loan shall be a 30-year loan at <br />3.75% per annum. Security for the loan shall be in compliance with CWCB Financial Policy #5 with <br />the variances described. <br />Supplemental Loan Contract Conditions: <br />1) CWCB shall disburse loan funds at rate of 50% of the total project invoices submitted to CWCB <br />until the maximum loan amount is met. <br />2) The contract for this loan shall incorporate the provisions defined in the General Ordinance and <br />applicable Series Ordinances which govern the Water Fund's existing debt. Including: <br />a) This loan shall receive a second-lien priority on the Water Fund's net revenues that will <br />be on a parity with existing and future second-lien revenue obligations. <br />b) With regard to future parity debt, CWCB accepts the provisions in the General and Series <br />Ordinances which allows inclusion of all tap fees in the analysis of borrower's revenues <br />regarding parity testing on future debt. <br />Email copy: Thomas Sather, City of Aurora, Debt & Financing Administrator <br />Tiffany McEachen, CH2M Hill, Program Delivery Engineer <br />Amy Stengel, AGO <br />Attachment: Water Project Construction Loan Program — Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.