Laserfiche WebLink
SNOTEL Site Elevation Dec.1 Jan.1 Feb.1 Mar.1 Apr.I <br /> Vail Mountain 109300 5.6 9.3 13.5 16.9 22.3 <br /> SWE Threshold 9.8 16.3 21.6 25.3 31.2 <br /> Beaver Creek Village 8,500 2.1 4.0 6.8 9.2 11.6 <br /> S w H.Thr+eshold 3.7 7.0 10.9 13.8 16.2 <br /> McCoy Park 91,480 4.0 6.9 10.3 12.9 17.1 <br /> S WE Threshold 7.0 12.1 16.5 19.3 25.5 <br /> General guidance for using the Data is: One SNOTEL site nearing but not exceeding <br /> thresholds requires the Permit Helder notify the CWCB and Project Sponsors via email. <br /> If two or more SNGTFL, sites in or near the. target are nearing snowpock snow water <br /> equivalent suspension criteria then the Permit Holder will initiate discussions with the <br /> CWCB andProject:Sponsors about operations. If two or more SNOTEL sites in or rear <br /> the target area have exceeded the State's suspension criteria then the generators that <br /> rem nably afrect those SNOTEL sites are suspended until the MRCS mapping shows <br /> tidings drop below the State's suspension criteria.. <br /> B, The Permit Holder will nd o c when the at ae t <br /> u lic welfare in the 'Operations in the target ,area will be suspended until <br /> the emergency conditions are no longer a threat to the public. <br /> C. Th P it Holder will rdinate with Colorado v tion Center <br /> n haw clo lions afffcct pUblic .safety mft mwg to <br /> grate <br /> l�l�fi�'s•The CAIC will o and maintain a Cloud Seeder user group on their <br /> website. This user group will have access to Highway Avalanche [anger levels.The <br /> CA1C will provide advice on public safety with respect to avalanches. Regulations <br /> and operational decisions are the responsibility of the CWBC and the Permit <br /> Holder. <br /> Contacts <br /> CAIC Daily operations _ .ne 303-499-9650 <br /> Emergencies--Ethan Greene,&u MC@1!&.co.u&303-204.6027 <br /> CWCB: Daily operations AM,h atoate.co.us,303 866 3441-ext 3209 <br /> Eampnc es Joe Busto, 303 597-5595 <br /> Procedure October 1 <br /> 1. The Permit Holder will give CWCB a list of people that need access to LAIC <br /> products by October 1. <br /> 2. The CWCB will provide the email list to the LAIC and the CAIC will create new <br /> accounts and delete old ones. <br /> Procedure-November 1 through April 30 <br /> 1. When the Highway Danger Level reaches HIGH on an impacted roW section, the <br /> Permit Holder will contact the LAIC via email and carbon copy the CWCB to <br /> 5 <br />