My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ROD WM Permit 2011-01
CWCB
>
Weather Modification
>
DayForward
>
ROD WM Permit 2011-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2011 1:47:02 PM
Creation date
6/28/2011 12:58:18 PM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
2011-01
Applicant
John R Thompson - Water Enhancement Authority
Sponsor Name
Water Enhancement Authority
Project Name
ROD Grand Mesa
Title
Record of Decision Public Hearing
Prepared For
Water Enhancement Authority
Prepared By
CWCB
Date
2/25/2011
County
Mesa
Weather Modification - Doc Type
Record of Decision
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. The Permit Holder will coordinate with the CWCB and the Colorado Avalanche Information <br />Center (CAIC), and the Colorado Department of Transportation in times of high and extreme <br />avalanche hazard levels and will suspend operations at generator locations though to be affecting <br />the areas of concern in the name of health, environment, and public safety, as determined by the <br />CAIC staff and the specialized CAIC cloud seeding website. <br />6. The Permit Holder must prepare progress reports that include a detailed log of seeding operations, <br />generators used, seeding rates, and daily durations of operations in Microsoft Excel spreadsheet <br />format and submit them electronically. The applicant will develop a detailed end of year report on <br />operations with an estimated evaluation of effectiveness. The annual report must be submitted no <br />later than June 30th of any given year. The Permit Holder will maintain an Excel spreadsheet with <br />the generator site locations with latitude and longitude data for every generator location and <br />update it and submit it after every change in location. <br />7. The weather modification permit shall be further subject to such other terms and conditions as are <br />set forth in the permit. In particular, funding for operations from the CWCB and external agencies <br />outside of the CWCB will be contingent on strict adherence to permit requirements and prompt <br />completion of annual reports. <br />8. The Permit Holder will cooperate with any CWCB or other requests to coordinate with and <br />provide data for independent evaluations of operations conducted by WEA. <br />9. WEA will be required to provide a yearly operational plan to the CWCB by November 1 st of every <br />season with all of the updated information related to operations. <br />10. This permit request is recommended for approval to the CWCB Director. If approved by the <br />CWCB Director said permit shall be known as WM Permit No. 2011 -01. <br />RECOMMENDATION <br />e2 <br />Date Joe BAW, Weather Modification Permit Program <br />Colorado Water Conservation Board <br />�'3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.