My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ClimateChangeCOReport2008Phase2_SOW
CWCB
>
Grants
>
DayForward
>
ClimateChangeCOReport2008Phase2_SOW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2011 10:11:25 AM
Creation date
6/3/2011 10:11:23 AM
Metadata
Fields
Template:
Grants
Applicant
University of Colorado - CIRES
Grant Type
Severance Tax
Fiscal Year (i.e. 2008)
2009
Project Name
Climate Change in Colorado Synthesis Report
CWCB Section
Water Conservation & Drought Planning
Contract/PO #
OE PDA 09-27
Grants - Doc Type
Scope of Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5: Project Team reviews Sept 30 A: "Salaries and Wages" <br /> design and page proofs and <br /> document goes to printer <br /> 6: Printed report delivered Oct 6 E: "Other Direct Costs" <br /> 7: Project team participates in Nov 30 A: "Salaries and Wages" and D: <br /> conferences and meetings to "Travel" <br /> present and discuss the report <br /> Notes on attached Budget: <br /> A & B: Salaries and wages and fringe benefits: Project team includes personnel who will <br /> receive salaries include (in alphabetical order): Dr. Joseph Barsugli, Dr. Kristen Averyt, <br /> and a person -month for personell to assist with compling the supplementary material and <br /> putting it on a web page. Computer System Support Personnel are required to support <br /> work by the Project Team. The Team is lead by Co -PI Dr. Andrea Ray who serves at no <br /> cost as she is a federal employee. <br /> In September, Project Team work through Task XX will be completed, representing 1 /2 of <br /> "A: Salaries and Wages" and "B: Fringe Benefits." <br /> In October, the remaining Project Team work through Task 8 (Delivery of Final Draft) <br /> will be completed, representing the remaining 1 /2 of "A: Salaries and Wages" and `B: <br /> Fringe Benefits." <br /> C: There is no permanent equipment requested. <br /> D: Travel and E: Other Direct Costs. No travel is requested in this SOW because travel <br /> funds were provided in the previous SOW. "Other direct costs" are funds for layout of the <br /> document and for printing <br /> G. Indirect Costs are billed at the 26% rate for Off - Campus research (a lower rate than <br /> On- Campus research), the rate is set each year by an agreement with the U.S. <br /> Government. <br />
The URL can be used to link to this page
Your browser does not support the video tag.