My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tamarack Contract and Supporting Docs
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Tamarack Contract and Supporting Docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2011 1:44:12 PM
Creation date
5/16/2011 1:42:36 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Tamarack Contract and Supporting Docs
State
CO
NE
Basin
South Platte
Water Division
1
Date
11/18/1999
Title
Tamarack Contract and Supporting Docs
Water Supply Pro - Doc Type
Contract/Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
State under the terms of this agreement Except for the provision of services by <br />NCWCD personnel as described in paragraph 1 A above, the NCWCD shall not <br />be required to expend funds or resources in the performance of this agreement <br />except for the funds provided by the State under the terms of this agreement <br />C Coordinate and cooperate with the State as necessary, or when requested by the State, <br />before, during, and after project delivery <br />D Provide reports to the State as requested by the Project Leader by December 31, <br />1999, and September 30, 2000 and every three months thereafter if the contract is <br />extended, with a final report due upon completion of the project work Such reports <br />shall indicate whether the projects are on schedule, if any projects have been <br />modified, and the nature of the modifications, any changes in the distribution of <br />Ull the ai llo ui lt of lU�ll e xp ell ucu to date b project, alld Vtl'ler 111fo1niat1V11 as <br />shall be reasonably requested by the Project Leader <br />E Maintain a complete file of all records, documents, communications, and other <br />written materials which pertain to the completion of the projects and the delivery of <br />services under this contract, including but not limited to receipt and expenditure of <br />funds and its provision of services, and shall maintain such records for a period of <br />three (3) years after the date of termination of this contract or final payment <br />hereunder, whichever is later <br />F When procuring goods and services from third persons in connection with the <br />performance of this contract, comply to the extent practicable with the requirements <br />of the Colorado Procurement Code and regulations and rules promulgated <br />thereunder Reference Articles 101 through 112 of Title 24, C R S , and rules <br />promulgated thereunder (1 C C R 101 -9), including requiring such third persons to <br />secure and provide evidence of having secured performance bonds for any capital <br />construction in excess of fifty thousand dollars (References Section 38 -26 -106, <br />CRS) <br />2 The State Shall <br />A Provide up to $209,000 00 in cost sharing toward the projects described in Exhibit <br />A <br />B Review and approve, as appropriate, engineering designs submitted by NCWCD for <br />development and enhancement at the Tamarack Ranch S WA and for any additional <br />or substitute sites which may be approved for development and enhancement <br />pursuant to this contract <br />C Review and approve requests, with justification, to modify the design or cost <br />Page 2 of 6 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.