My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Joint Front Range Climate Change Study SOW
CWCB
>
Grants
>
DayForward
>
Joint Front Range Climate Change Study SOW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2011 4:25:21 PM
Creation date
3/29/2011 12:00:42 PM
Metadata
Fields
Template:
Grants
Applicant
City of Aurora
Grant Type
Severance Tax
Fiscal Year (i.e. 2008)
2008
Project Name
Joint Front Range Climate Change Vulnerability Study
CWCB Section
Water Conservation & Drought Planning
Contract/PO #
C154126
Grants - Doc Type
Scope of Work
Document Relationships
Joint Front Range Climate Change Study Contract
(Message)
Path:
\Grants\DayForward
Joint Front Range Climate Change Study Invoice
(Attachment)
Path:
\Grants\DayForward
Joint Front Range Climate Change Study Letter
(Attachment)
Path:
\Grants\DayForward
Joint Front Range Climate Change Vulnerability Study
(Message)
Path:
\Climate Change\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to generate climate derived natural streamflow sequences for this initial <br />analysis is described in Section II under Procedure. <br />d. Task 4: Climate Sensitivity Analysis <br />Run each Delta TP scenario (provided by the PSC) through the historically <br />calibrated hydrology model to generate five scenarios of future natural <br />streamflow for each location. <br />e. Task 7: Draft and Final Reports <br />Upon project completion, the investigating team will have three months to <br />complete and submit a Draft version of a Final Report to AwwaRF. This <br />document will be reviewed by AwwaRF. Three months after the Draft Report <br />has been turned in, a Final Report is due to AwwaRF. For further details <br />regarding both reports see the attachment section. <br />5. Any additional tasks necessary for completion of the project that were not <br />specifically outlined in item 4. <br />6. Proposed schedule to complete each phase of the research. <br />7. Cost (by task) to perform above tasks. <br />Details provided in the Scope of Work submitted to the PSC members may be used in the writing of the <br />tailored collaboration AwwaRF research proposal. Particulars of the required information are located in the <br />attachment section of this document. <br />Scope of Work Submission <br />Please email a complete copy of the Scope of Work to the PSC team no later than <br />February 28, 2009. <br />TERMS OF AGREEMENT <br />Before the project proposal is submitted to AwwaRF reviewers, the PSC must verify the <br />contract provisions are acceptable to all contributing investigators and sub investigators. <br />It is important to note that AwwaRF intends to solely own and publish a final report. If <br />the research contract will not be accepted by an investigating team, immediately contact <br />the PSC. If the contract may be accepted with conditions, please specify such conditions <br />within the submitted Scope of Work. If there are questions or concerns regarding the <br />agreements, please contact Sean Lieske by email at slieske ,awwarf.org or by phone at <br />303 - 347 -6106 (o) or 303 - 907 -6776 (c), the AwwaRF representative for this project <br />through funding approval. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.