TENTATIVE SCHEDULE OF KEY DATES <br />Proposal Dates <br />March 15, 2008, Submit tailored collaboration proposal to AwwaRF <br />for review <br />April 2008 Acceptance of Project Agreements <br />September 20, 2008 Begin Project <br />Project Dates <br />Start Date <br />Begin Project <br />Same month as start date <br />PI(s) update the PSC and WWA about the progress <br />of the hydrology models <br />I month after start date <br />PI(s) meet with the PSC and WWA to evaluate <br />preliminary research <br />3 months after start date <br />Period Report 1 submitted to AwwaRF, PSC, and <br />WWA by PI(s) <br />Progress meeting by the PI(s) for the PSC and <br />WWA <br />6 months after start date <br />Period Report 2 and Technical Summary submitted <br />to AwwaRF, PSC, and WWA by PI(s) <br />Progress meeting by the PI(s) for the PSC and <br />WWA <br />9 months after start date <br />Period Report 3 submitted to AwwaRF, PSC, and <br />WWA by PI(s) <br />Progress meeting by the PI(s) for the PSC and <br />WWA <br />10 months after start date <br />Project completion <br />13 months after start date Draft Report due to AwwaRF from investigators <br />3 months after draft date Final Report due to AwwaRF <br />10 months after draft date Project Termination Date <br />Please note .Aw%�aRF will schedule additional meetings with the PI(s) and an external Project Advisory <br />C'onunittec (PAL') meeting throughout this project. These meetings have not been included in the above <br />schedule. <br />9 <br />