Laserfiche WebLink
August 18, 2010 <br />Page 2 <br />Task 3: Draft technical memorandum <br />AMEC will write a technical memorandum that describes the methods and results of the <br />work. This memorandum will be provided to CWCB staff for review. Based on <br />comments received from CWCB on the draft technical memorandum, it will be revised <br />into a final version and delivered to CWCB. <br />Cost estimate and reimbursement <br />AMEC estimates the cost of this work to be $7,055. AMEC proposes to do this work on <br />a time - and - materials basis with total cost not to exceed this amount. The cost estimate <br />includes AMEC's best estimates of the labor required to conduct the work along with <br />reasonable allowance for contingencies. <br />AMEC Earth & Environmental <br />