My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - FMRICo Recharge & Wetlands Project_Contract C150464
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
South Platte - FMRICo Recharge & Wetlands Project_Contract C150464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2012 9:59:29 AM
Creation date
10/26/2010 12:26:56 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
South Platte
Applicant
Fort Morgan Reservoir & Irrigation Company
Description
FMRICo Reharge & Wetlands Project
Account Source
Basin & Statewide
Board Meeting Date
9/15/2009
Contract/PO #
150464
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 4: Installation of Ponds <br />TASK 1: Piueline <br />• Pipeline- install pipeline and related appurtenances from the South Platte River south to the <br />Groves pond location to deliver water to the Groves Ponds and additional Ponds along the <br />pipeline route. <br />• Civil Design Group (CDG) will finalize design for pipeline and related appurtenances, <br />receive and evaluate proposals, and provide construction oversight during construction. <br />Major deliverables will include pipeline, intake structure, metering devices, valves and <br />appurtenances to make the pipeline 100% operational. <br />TASK 2: Pumus <br />. Pumps- install pumps (2), electrical controls, and related appurtenances to pump water from <br />the South Platte River to the Groves Ponds and additional Ponds along the pipeline route. <br />• Civil Design Group (CDG) will finalize design for pumping equipment, electrical controls <br />and related appurtenances, receive and evaluate proposals, and provide construction <br />oversight during installation and testing of pump equipment. <br />• Major deliverables will include pumps and electrical controls. <br />TASK 3: Well and Well Pumu <br />Well & Well Puxnp- Install one water well and pumping equipment near the Groves Ponds, <br />electrical controls, flow meter, and related appurtenances to pump ground water from the <br />South Platte alluvium near the Groves Ponds through the pipeline to the South Platte River. <br />TZA Water Engineers, Inc. (TZA) will design the well and pumping equipment, electrical <br />controls and related appurtenances, receive and evaluate proposals, and provide construction <br />oversight during installation and testing of the water well and associated pump equipment. <br />• Major deliverables will include a water well, pump equipment, and electrical controls. <br />TASK 4: Wetlands and Ponds <br />• Wetlands and ponds- install / rehabilitate seven (7) pond structures that will be designed to <br />optimize recharge, augmentation supply, and waterfowl habitat. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.