My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - FMRICo Recharge & Wetlands Project_Contract C150464
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
South Platte - FMRICo Recharge & Wetlands Project_Contract C150464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2012 9:59:29 AM
Creation date
10/26/2010 12:26:56 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
South Platte
Applicant
Fort Morgan Reservoir & Irrigation Company
Description
FMRICo Reharge & Wetlands Project
Account Source
Basin & Statewide
Board Meeting Date
9/15/2009
Contract/PO #
150464
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATEMENT OF WORK <br />WATER ACTIVITY NAME: Fort Morgan Reservoir and Irrigation Company Recharge and <br />Wetlands Project <br />GRANT RECIPIENT: Fort Morgan Reservoir and Irrigation Company <br />FUNDING SOURCE: WSRA funds ($250,000 from South Platte Basin Account and $420,000 <br />from the Statewide Account), CWCB Loan (up to $1,494,800), Applicant's own funds for <br />balance <br />INTRODUCTION AND BACKGROUND: <br />Pravide a brief description of the project. Please limit to no more than 200 words; this will be <br />used to inform reviewers and the public about your proposal. <br />This project is a structural water project to both divert water under a junior water right when <br />available for recharge and augmentation, and to re-divert and re-time augmentation credits that <br />result from more senior recharge projects. This project will develop and use approximately 500- <br />1,000 acre-feet of new water per year and 1,500 acre-feet of re-timed augmentation credits. <br />While conducting these water supply operations, this project will also benefit waterfowl in the <br />basin by providing additional wetland habitat. <br />This project involves installing a pipeline from the South Platte River three miles to the recharge <br />ponds, installing two pumps to pump water from the river, installing one augmentation well and <br />pumping equipment to pump water back to the river for augmentation purposes, and installing <br />seven augmentation/ <br />recharge ponds. <br />Project Implementation: Project implementation for which funds are being requested will <br />consist of installing a pipeline from the South Platte River three miles to the recharge ponds, <br />installing two pumps to pump water from the river, installing one augmentation well and <br />pumping equipment to pump water back to the river for augmentation purposes, and installing <br />seven augmentation/recharge ponds. <br />OBJECTIVES: <br />The Objective of this project is to provide diversion of junior water rights and diversion of <br />excess augmentation credits that result from more senior recharge projects. <br />The four major tasks of the project are: <br />Task 1: Installation of Pipeline <br />Task 2: Installation of Pumps <br />Task 3: Installation of Well and Well Pump <br />
The URL can be used to link to this page
Your browser does not support the video tag.