Laserfiche WebLink
41) In 2003, a groundwater model was developed as an operating tool for the Project. CDOW, <br /> NCWCD, and Colorado State University staff worked together to create the original groundwater <br /> model. Upon negotiations with objectors, this original model was revised and updated. The <br /> revised groundwater model was used to determine the pumping depletions and pond accretions <br /> for the Project structures. To expedite accounting, output from the revised groundwater model <br /> was manipulated to create monthly URFs for all the Project structures. <br /> • <br /> 2 IPage <br />