Laserfiche WebLink
• Table 9 <br /> Stream Reach Impacted by <br /> Tamarack Recharge Project Operations <br /> Percent of Pumping or Recharge Coming from Specified Stream Reach <br /> Reach A Reach B Reach C Reach D <br /> Entire Model Western Edge of Crook Road to Tamarack SWA <br /> Scenario Model Grid to Crook Road to <br /> Grid County Line <br /> (14 miles) County Line (9 miles) Red Lion Road <br /> (12 miles) (6.5 miles) <br /> All Wells Pumping Their <br /> 1 Approximate Decreed 100% Not Run Not Run 95% <br /> Rate for 90 days <br /> All Wells Pumping Their <br /> 2 Approximate Decreed 100% 100% 99% 95% <br /> Rate for 120 days <br /> Recharge to Furthest <br /> 3 South Ponds for 120 100% 99% 96% 91% <br /> days <br /> - _ <br /> Wells and Ponds <br /> 4 operating for 120 days 100% 100% 100% 98% <br /> • (Depletions Portion) <br /> Wells and Ponds <br /> 4 operating for 120 days 100% 99% 94% 89% <br /> (Accretions Portion) <br /> • <br />