Laserfiche WebLink
Table 8 <br /> Total Increase in ET Due to Project Recharge <br /> A B C D =C/A E =CB <br /> Percent <br /> Total Total Increase in Percent <br /> Project Project Total ET Increase in <br /> Operational Scenario Water Accretions <br /> Increase Based on ET based on <br /> Recharged to River in ET Total Total Project <br /> Project Accretions <br /> Recharge <br /> acre-feet acre -feet acre -feet % % <br /> Current Project configuration with <br /> 10 recharge wells and 3 recharge 12,197 3,409 177 1% 5% <br /> ponds <br /> Decreed Project configuration with <br /> 17 recharge wells and 12 recharge <br /> 20,737 6,083 298 1% 5% <br /> ponds. All recharge goes to ponds <br /> north of the interstate <br /> Decreed Project configuration with <br /> 17 recharge wells and 12 recharge <br /> ponds. Recharge is distributed to 20,705 6.779 333 2% c o o <br /> III all ponds (3 wells going to Pond 4 <br /> located south of the interstate). <br /> Decreed Project configuration with <br /> 17 recharge wells and 12 recharge <br /> ponds. Recharge is distributed to 20,705 7,024 352 2% 5% <br /> all ponds (5 wells going to Pond 4 <br /> located south of the interstate). <br /> • <br />